Skip to main content

North America's first public-use quick-charge station for EVs opens

Portland General Electric, Oregon’s largest utility, and NEC Corporation, a leading network, communications and information technology company, have opened North America’s first public-use, quick-charge station for electric vehicles.
January 31, 2012 Read time: 2 mins

1067 Portland General Electric, Oregon’s largest utility, and 1068 NEC Corporation, a leading network, communications and information technology company, have opened North America’s first public-use, quick-charge station for electric vehicles.

“By making charging convenient and available for public use, we are telling car manufacturers that Oregon is ready for the next generation of electric vehicles — and we want our state to be a leader in introducing these cars to the rest of the country.”

The station was awarded public-use certification by the City of Portland following the successful installation and testing of the station manufactured by Takasago, a subsidiary of NEC, at the PGE headquarters in the Two World Trade Center parking garage on Salmon Street, Portland. The Takasago Rapid Charging Station is specialised for recharging electric vehicles with lithium-ion batteries and requires only 20 to 30 minutes to recharge a battery to 80 percent of full strength.

PGE and NEC officially opened the quick-charge station with Governor Ted Kulongoski, who charged up an all-electric Nissan Leaf , during a two-day Leaf test drive event at PGE. Portland and the state of Oregon have been designated as top-tier launch markets for the Nissan Leaf when it goes on sale in the United States in December.

“Quick-charging stations are an exciting advancement in our effort to bring electric vehicles to Oregon,” said Gov. Kulongoski. “By making charging convenient and available for public use, we are telling car manufacturers that Oregon is ready for the next generation of electric vehicles, and we want our state to be a leader in introducing these cars to the rest of the country.”

For more information on companies in this article

Related Content

  • Looking forward to CARTES 2014 in Europe, Asia and America
    November 20, 2013
    2014 will see CARTES events in Asia and America – and don’t forget to put a note in your diary for CARTES Secure Connexions Event 2014 to be held from 4 to 6 November in Paris Welcome to Day 3 of the CARTES Secure Connexions Event 2013. This is the last day of the show and we hope you have enjoyed everything so far - and will continue to get a great deal out of the sessions and conferences. We are proud to announce that we have excellent indicators in terms of registered visitor numbers at the show. Gen
  • IMSA plans product certification overhaul
    April 21, 2022
    North American trade body for transportation aims to reflect pace of technological change
  • US Cities push for smarter poles
    June 25, 2018
    US Cities The need to connect existing infrastructure has led various US transit authorities into imaginative alleyways: David Crawford examines some new roles for street furniture. US cities are vying with each other in developing schemes to create a new generation of connected places. Their strategies include taking advantage of their streetlight poles’ height and ubiquity to give them new roles in supporting intelligent nodes. They are now being equipped for collecting real-time data on key transport
  • Close shave for Brazilian project
    June 12, 2015
    Signing the order to equip a new control room just 45 days before the city hosts a major sporting event is challenging - but some deadlines just cannot be moved. There is nothing like a deadline to concentrate minds and effort as Mitsubishi and the Brazilian city of Belo Horizonte discovered in the run-up to the 2014 World Cup. Although municipal authorities had been considering a new command centre for years, it was the hosting of the World Cup last summer that provided the final impetus.