Skip to main content

Nissan speeding up EV charging infrastructure

Nissan has teamed up with leading European utility and Electrical Vehicle (EV) supply equipment companies to speed development of cheaper, smaller, quick chargers for EV batteries, and accelerate the installation of publicly available Quick Charge (QC) points right across Europe. This agreement between Nissan, Circutor, DBT, Efacec, Endesa and Siemens is expected to result in a dramatic reduction in the price of the units – by over half to under €10,000 (US$13,668) – paving the way for businesses such as se
June 22, 2012 Read time: 2 mins
838 Nissan has teamed up with leading European utility and Electrical Vehicle (EV) supply equipment companies to speed development of cheaper, smaller, quick chargers for EV batteries, and accelerate the installation of publicly available Quick Charge (QC) points right across Europe.

This agreement between Nissan, Circutor, DBT, Efacec, Endesa and Siemens is expected to result in a dramatic reduction in the price of the units – by over half to under €10,000 (US$13,668) – paving the
way for businesses such as service stations, car park operators and retail outlets to install quick chargers and run them profitably as a commercial enterprise. This will mean Nissan Leaf drivers, as well as other quick charge-enabled vehicles, could use their car for longer journeys and recharge the car’s battery to 80 per cent capacity in less than half an hour. A Cha de Mo DC quick charger delivers 50 kW of high-voltage direct current (DC) electricity straight to the battery, speeding up the charging process.

As a result of Nissan’s intervention, it is expected that there will now be thousands of QCs across Europe by the end of 2012, and tens of thousands by 2015


For more information on companies in this article

Related Content

  • IBM and NXP partner on Dutch connected car pilot
    February 21, 2013
    The first results of a smarter traffic pilot, conducted in the Dutch city of Eindhoven by IBM and NXP Semiconductors demonstrate how the connected car automatically shares braking, acceleration and location data that can be analysed by the central traffic authority to identify and resolve road network issues, say the companies. “The trial successfully showed that anonymous information from vehicles can be analysed by local traffic authorities to resolve road network issues faster, reduce congestion and impr
  • Semi-autonomous hybrid vehicle trials show fuel, emission savings
    July 16, 2012
    The Transport Research Laboratory has unveiled an innovative semi-autonomous vehicle prototype. It offers improves in environmental performance and safety but also displays some shortcomings. Mike Woof reports. The UK's Transport Research Laboratory (TRL) has been working on an innovative project to develop a prototype vehicle intended to reduce fuel consumption. Based on a Ford Escape hybrid model, TRL's Sentience vehicle uses a combination of mobile communications and mapping technologies to reduce fuel c
  • Authorities play the parking ticket
    April 10, 2014
    Having long been a cause of contention with their constituents, local authorities are now using parking provision to entice shoppers and reduce congestion. To say that parking, and particularly parking enforcement, is a contentious and emotive issue is something of an understatement. Across the globe the discontentment with parking facilities, charges and enforcement is a major cause of friction between local authorities and the residents, businesses and drivers in the area. Recently there was outrage in
  • California aims to generate electric power from traffic congestion
    April 20, 2017
    California is planning a US$2.3 million initiative that will generate electrical power from traffic, according to the San Francisco Chronicle. The California Energy Commission recently voted to fund two piezoelectricity projects, which convert pressure into power. One pilot will test a 200-foot-long piece of asphalt on UC-Merced’s campus, which is designing a 200-foot stretch of asphalt that will be sowed with inch-wide piezoelectric generators, which will be stacked within arrays below the road where it is