Skip to main content

Nissan Leaf will power homes

Nissan Motor Company has unveiled a system which enables electricity to be supplied from the lithium-ion batteries installed in Nissan Leaf to ordinary households, as part of its comprehensive efforts toward the realisation of a zero-emission society. The new system was unveiled at a house built in front of the Nissan global headquarters by Sekisui House Ltd.
April 16, 2012 Read time: 2 mins
RSS838 Nissan Motor Company has unveiled a system which enables electricity to be supplied from the lithium-ion batteries installed in Nissan Leaf to ordinary households, as part of its comprehensive efforts toward the realisation of a zero-emission society. The new system was unveiled at a house built in front of the Nissan global headquarters by Sekisui House Ltd.

Nissan will continue development and study how it can be fully aligned and connected with current power systems. Working with a wide range of partners interested in both its development and sales, Nissan says it aims to commercialise the system during this fiscal year.

Through this system, electricity stored in Nissan Leaf can be supplied to a house by connecting the car to the house's electricity distribution panel using a connector linked to the Leaf's quick charging port. The connector complies with the CHAdeMO Association's protocol for quick chargers, adopted globally for its great versatility, safety and reliability.

Nissan says that with this system, the Leaf can be used as an electricity storage device for houses in preparation for power outages and/or shortages. The lithium-ion batteries can store up to 24kWh of electricity, sufficient to power an average Japanese household for about two days.

Nissan believes this system will allow households to be supplied with a stable amount of electricity throughout the day and reduce the burden on the current power supply by charging and storing electricity in Nissan Leaf with electricity generated at night or through sustainable methods such as solar power, and using it during high demand periods.

This system can not only supply electricity from the vehicle but also charge it to the vehicle.

For more information on companies in this article

Related Content

  • First all-electric taxi fleet could hit roads in US
    October 23, 2012
    A fleet of all-electric cabs may soon be plugged in and driving on the streets of Arlington, Virginia, US, a sign the environmentally-friendly vehicles are slowly catching on as a viable means of transportation in the US. "No one has really taken the first step to do this," said Malik Khattak, founder of Electric Vehicle Taxicab Company, who has proposed a fleet of 40 all-electric Nissan Leaf cars which he says will be the first taxicab fleet of its kind in the US.
  • Dr Hiroyuki Watanabe looks ahead to 20th World Congress in Tokyo
    October 24, 2012
    The 20th ITS World Congress will be held in Tokyo from 14-18 October, 2013. Dr Hiroyuki Watanabe, Chairman, Japan Organising Committee reveals some of the highlights that delegates can look forward to.
  • Siemens tests eHighway system
    August 7, 2014
    Siemens, in conjunction with Volvo, is to trial an eHighway system on a two-mile stretch of highway in California in the vicinity of the ports of Los Angeles and Long Beach. The company was awarded the contract by Southern California’s South Coast Air Quality Management District (SCAQMD) with the objectives of eliminating local emissions, reducing the consumption of fossil fuels and cutting the operating costs of trucks. The two ports are seeking an emission-free solution, Zero Emission I-710 Project, for a
  • Integrating traffic systems improves management and control
    April 25, 2012
    Following a successful trial in 2007, VicRoads has adopted Streams Motorway Management from Transmax as its primary traffic management and control system Throughout the world, the avoidable social cost of traffic congestion continues to rise each year with increased motorisation, urbanisation and population growth. Traffic congestion is responsible for an increase in travel times, vehicle operating costs and carbon emissions. In 2007, VicRoads commissioned Streams Motorway Management for the M1 Monash Freew