Skip to main content

New Zealand achieves EV target five months early

The New Zealand Government has achieved its 2017 electric vehicle (EV) registrations target five months early, Transport Minister Simon Bridges and Energy and Resources Minister Judith Collins have announced. Currently around 200 EVs are registered monthly, with a total of 4,027 EVs now registered in New Zealand. If registrations continue to increase, the Government says it will be on track to meet its target of 64,000 EVs registered in New Zealand by the end of 2021. In May 2016, the Government announced i
July 27, 2017 Read time: 1 min
The New Zealand Government has achieved its 2017 electric vehicle (EV) registrations target five months early, Transport Minister Simon Bridges and Energy and Resources Minister Judith Collins have announced.


Currently around 200 EVs are registered monthly, with a total of 4,027 EVs now registered in New Zealand. If registrations continue to increase, the Government says it will be on track to meet its target of 64,000 EVs registered in New Zealand by the end of 2021.

In May 2016, the Government announced its Electric Vehicles Programme, a wide ranging package of measures to encourage the uptake of EVs in New Zealand. The target is to double the fleet each year, reaching 64,000 EV registrations by the end of 2021.

Related Content

  • ChargeWheel sparks mobile EV charging in San Francisco
    April 8, 2019
    ChargeWheel has secured $1 million in funding to launch a mobile electric vehicle (EV) charging network in the San Francisco Bay Area. The network will be based on ChargeWheel’s mobile Energy Trailers, which don’t require a connection to the grid, and can therefore operate in any car park. The company says they offer a combined solar-powered generation and energy storage solution, and plans to deploy 100 in the Bay Area by the end of 2019. The units can simultaneously charge four EVs or up to 400 electric
  • Charging station infrastructure boost to electric vehicle use
    July 17, 2012
    The first section of a planned network of stations for charging electric vehicles – the West Coast Electric Highway – opened in March, promising a welcome boost to the environment and economy of Oregon. Pete Goldin reports What should come first, the electric vehicle or the charging station? This dilemma has been hindering proliferation of ‘EVs’ in the US for years. Without a widespread and reliable infrastructure of charging stations, the American public is not likely to adopt EVs en masse. This may all b
  • Early bird deadline is near for Asecap Days 2025
    March 21, 2025
    Check out event before 2 April to take advantage of reduced registration fee
  • Widest bridge in the world Port Mann open in Vancouver
    April 25, 2013
    Port Mann Bridge, designed to growing regional congestion and improve the movement of people, goods and transit throughout greater Vancouver, is now open for business. The widest bridge in the world, the Port Mann Bridge located in the metro Vancouver area, in British Columbia, Canada, features an Open Road Tolling (ORT) system, also called All Electronic Tolling (AET), which will ultimately cross all 10 lanes of traffic.