Skip to main content

New VP of engineering at ComNet

Communication Networks (ComNet) has announced the appointment of Christopher Costa as the company’s vice president of engineering. Until joining the company, Costa previously held the role of director of engineering at Radiant Communications and Fiber Options/GE Security and has more than 20 years of experience in the development of successful new products for the physical security industry.
April 17, 2012 Read time: 1 min
RSSCommunication Networks (30 ComNet) has announced the appointment of Christopher Costa as the company’s vice president of engineering. Until joining the company, Costa previously held the role of director of engineering at Radiant Communications and Fiber Options/GE Security and has more than 20 years of experience in the development of successful new products for the physical security industry.

Costa will be responsible for managing the day-to-day activities of the ComNet engineering department including the development and expansion of the the company’s fibre optic and Ethernet transmission product line and planned engineering department expansion.

For more information on companies in this article

Related Content

  • ECG announces election of new board and President
    May 27, 2016
    Wolfgang Göbel, chief sales officer, Horst Mosolf, has been elected president of the Association of European Vehicle Logistics (ECG) in an election held during the annual general assembly. He brings more than 36 years of relevant industry experience to his new role and has served as ECG vice-president for the last seven years. Mats Eriksson, CEO, AB SkandiaTransport, another long-term board member, who previously served as Treasurer, assumes the role of vice-president. A record attendance of some 1
  • Aurecon-Jacobs JV secures Melbourne metro contract
    July 3, 2015
    Melbourne Metro Rail Authority (MMRA) has appointed the Aurecon Jacobs Mott MacDonald (AJM) joint venture as the technical, planning and engagement advisor for the Melbourne Metro Rail Project in Victoria, Australia. The Melbourne Metro Rail Project unlocks critically needed capacity in Melbourne’s rail network and begins transforming the network into an international metro-style rail system. It includes two nine-kilometre rail tunnels from South Kensington to South Yarra as part of a new Sunbury to Cra
  • Another section of West Coast Green Highway EV charging infrastructure announced
    April 19, 2012
    The Washington State Department of Transportation (WSDOT) has selected AeroVironment to manufacture, supply, install and operate a network of nine fast-charging stations for electric vehicles on Interstate 5 and US 2. Stations will be located every 40 to 60 miles along stretches of I-5 between the Canadian border and Everett and between Olympia and the Oregon border, as well as along US 2 between Everett and Leavenworth.
  • Path to tolling interoperability
    May 16, 2012
    Federal Signal Technologies (FSTech) will come to the ITS America Annual Meeting with a focus on tolling interoperability. As the company points out, it has always been a proponent of providing multi-protocol systems and solutions for open road tolling. These systems allow agencies and integrators to leverage legacy tag populations while providing a forward look towards adoption of new technology platforms as they arrive. With the development and release of Sirit IDentity readers, PIPS Cameras, Idris Lane S