Skip to main content

A new tube for London

London’s Tube network now carries over a billion passengers a year and demand keeps growing. Much of the infrastructure is very old, some dating back to the 1860s, so a major upgrade to increase capacity is essential. Transport for London has already upgraded the Jubilee and Victoria lines and significant progress is being made on the Northern line and also with the delivery of new trains, tracks and signals for the sub-surface railway – the Metropolitan, Hammersmith and City, District and Circle lines. Upg
August 13, 2013 Read time: 2 mins
London’s Tube network now carries over a billion passengers a year and demand keeps growing. Much of the infrastructure is very old, some dating back to the 1860s, so a major upgrade to increase capacity is essential. 1466 Transport for London has already upgraded the Jubilee and Victoria lines and significant progress is being made on the Northern line and also with the delivery of new trains, tracks and signals for the sub-surface railway – the Metropolitan, Hammersmith and City, District and Circle lines. Upgrades on the remaining ‘deep tube’ lines – the Bakerloo, Central, Piccadilly and Waterloo and City – lie ahead.

The forthcoming Institution of Engineering and Technology (IET) London Area meeting on 4 September will feature a talk by Andy Guest, London Underground’s chief programme engineer for the Deep Tube Programme.  The talk will discuss the feasibility stage of this project, and give an insight into the challenges posed by bringing world-class engineering and new technology to an infrastructure introduced in the 19th century.

Venue is the Adelaide pub, Park Road, Teddington, TW11 0AU at 7pm.

Related Content

  • December 19, 2017
    Bombardier supplies 60 Aventra vehicles for London Rail Structure
    Bombardier has signed a contract with Porterbook and C2c to supply 60 of its Aventra vehicles to be used on the C2c rail franchise from September 2021 with the intention of increasing capacity and improving journeys for commuters into London. The overall value of the rolling stock and maintenance and support services contract is valued £105m ($139m) and will run until November 2029.
  • July 19, 2013
    Government green lights road and rail improvements
    UK Transport Secretary Patrick McLoughlin has confirmed a £1.2 billion order for more state of-the art trains to transform rail travel on one of Britain’s busiest intercity routes. The 270 carriages will be manufactured in Britain by Hitachi Rail Europe as part of the government’s overall £5.8 billion Intercity Express Programme (IEP). The trains will operate on the East Coast Main Line from 2019 and will deliver significant benefits to passengers, including boosting capacity by 18 per cent, improving trai
  • October 30, 2013
    HS2 ‘crucial to Britain’s future transport needs’
    Britain cannot meet its future transport needs without HS2, according to new evidence published by the government. Even with over US$80 billion of planned transport investment over the next six years the country’s railways will be overwhelmed. The strategic case for HS2 sets out in detail the need for a new railway line to provide the vitally needed extra capacity. Central to the case is new data that reveals the true extent of the crisis facing the UK rail network and the impact alternatives to buildin
  • January 27, 2012
    Integrate systems to reduce roadside infrastructure
    David Crawford reviews promising current developments. Instrumentation of the road infrastructure has grown to become one of the most dynamic sectors of the ITS industry. Drivers for its deployment include global concerns over the commercial and environmental pressures of traffic congestion, the importance of keeping drivers informed throughout their journeys, and the need to reduce accident rates and promote the safety of all road users, for example by enforcing traffic safety rules.