Skip to main content

A new tube for London

London’s Tube network now carries over a billion passengers a year and demand keeps growing. Much of the infrastructure is very old, some dating back to the 1860s, so a major upgrade to increase capacity is essential. Transport for London has already upgraded the Jubilee and Victoria lines and significant progress is being made on the Northern line and also with the delivery of new trains, tracks and signals for the sub-surface railway – the Metropolitan, Hammersmith and City, District and Circle lines. Upg
August 13, 2013 Read time: 2 mins
London’s Tube network now carries over a billion passengers a year and demand keeps growing. Much of the infrastructure is very old, some dating back to the 1860s, so a major upgrade to increase capacity is essential. 1466 Transport for London has already upgraded the Jubilee and Victoria lines and significant progress is being made on the Northern line and also with the delivery of new trains, tracks and signals for the sub-surface railway – the Metropolitan, Hammersmith and City, District and Circle lines. Upgrades on the remaining ‘deep tube’ lines – the Bakerloo, Central, Piccadilly and Waterloo and City – lie ahead.

The forthcoming Institution of Engineering and Technology (IET) London Area meeting on 4 September will feature a talk by Andy Guest, London Underground’s chief programme engineer for the Deep Tube Programme.  The talk will discuss the feasibility stage of this project, and give an insight into the challenges posed by bringing world-class engineering and new technology to an infrastructure introduced in the 19th century.

Venue is the Adelaide pub, Park Road, Teddington, TW11 0AU at 7pm.

Related Content

  • October 17, 2017
    New signalling technology for Circle and Hammersmith & City Lines 2018
    Thales has tested a new signalling control system on sub-surface trains on the Circle and Hammersmith & City lines, which enable trains to run closer together. The test aims to provide a more frequent service, reduce waiting times and help boost capacity for the Circle, District, Hammersmith & City and Metropolitan lines. The system will go live on the first section of the network as early as 2018.
  • December 4, 2012
    Success of London's Olympic public transport systems
    The Olympic flame has moved on, allowing review of the relative degrees of London’s 2012 transportation success, how it was done and with what lasting effects. Jon Masters reports. This magazine’s international position provides a good vantage point for assessing impressions left by London’s 2012 Olympic Games. On the whole, it has been only praise and congratulations heard since the closing ceremonies of the Olympic Games in August and the Paralympics in September. The events looked great and ran smoothly
  • February 5, 2014
    Move to modernise London underground leads to strikes
    A move by Transport for London (TfL) to modernise the London Underground, including the loss of 950 jobs and the closure of all ticket offices has led to the widespread strikes currently being experienced by travellers. The National Union of Rail, Maritime and Transport Workers (RMT) has called for the withdrawal of the cuts, saying that the plans are discriminatory and would leave important groups of staff vulnerable to abuse and assault as enforced lone working is pushed through. TfL claims the meas
  • February 2, 2015
    Cycling in London grows by ten per cent
    London’s cycling revolution accelerated last year, with 2014 seeing new records for usage of the capital’s cycle hire scheme and overall cycling on the Transport for London (TfL) road network. Across the TfL road network, London’s main roads, cycling levels in quarter 3 of 2014/15 (14 September to 6 December) were ten per cent higher than in the same quarter the previous year and the highest since records began in 2000. It was the fifth record quarter in a row. By the end of 2014/15, TfL forecasts a 12 p