Skip to main content

A new tube for London

London’s Tube network now carries over a billion passengers a year and demand keeps growing. Much of the infrastructure is very old, some dating back to the 1860s, so a major upgrade to increase capacity is essential. Transport for London has already upgraded the Jubilee and Victoria lines and significant progress is being made on the Northern line and also with the delivery of new trains, tracks and signals for the sub-surface railway – the Metropolitan, Hammersmith and City, District and Circle lines. Upg
August 13, 2013 Read time: 2 mins
London’s Tube network now carries over a billion passengers a year and demand keeps growing. Much of the infrastructure is very old, some dating back to the 1860s, so a major upgrade to increase capacity is essential. 1466 Transport for London has already upgraded the Jubilee and Victoria lines and significant progress is being made on the Northern line and also with the delivery of new trains, tracks and signals for the sub-surface railway – the Metropolitan, Hammersmith and City, District and Circle lines. Upgrades on the remaining ‘deep tube’ lines – the Bakerloo, Central, Piccadilly and Waterloo and City – lie ahead.

The forthcoming Institution of Engineering and Technology (IET) London Area meeting on 4 September will feature a talk by Andy Guest, London Underground’s chief programme engineer for the Deep Tube Programme.  The talk will discuss the feasibility stage of this project, and give an insight into the challenges posed by bringing world-class engineering and new technology to an infrastructure introduced in the 19th century.

Venue is the Adelaide pub, Park Road, Teddington, TW11 0AU at 7pm.

For more information on companies in this article

Related Content

  • VW scandal prompts emissions testing debate
    December 1, 2015
    In the wake of the VW scandal John Kendall looks at emissions testing on both sides of the Atlantic. Since the VW emissions story broke in September, emissions testing has come under greater scrutiny, and none more so than in Europe, where critics have long been highlighting the weaknesses of the testing system. Ironically, changes to the emissions testing process were already under review but the story has pushed it up the agenda.
  • What's next for transport communication systems?
    February 2, 2012
    Moxa Americas, Inc.'s Charles Chen ponders the way forward for transportation communications networks in the US
  • ITS in the Baltic States: on the rise
    August 12, 2020
    In the Baltic states, on north-east Europe’s border with Russia, the ITS sector is on the verge of big growth, finds Eugene Gerden - but more
  • No in-road equipment for Queensland's free flow toll bridge
    February 1, 2012
    By May this year, the new Gateway Bridge in Brisbane, which is being built alongside an existing bridge, will be open. With it will come an end-to-end free-flow tolling system. Interview with Sue Caelers, Queensland Motorway Ltd. Queensland Motorways Ltd owns and operates 61km of roadway in the area around Brisbane, Australia. This includes the Gateway Bridge and the Gateway Extension, Logan and Port of Brisbane motorways.