Skip to main content

A new tube for London

London’s Tube network now carries over a billion passengers a year and demand keeps growing. Much of the infrastructure is very old, some dating back to the 1860s, so a major upgrade to increase capacity is essential. Transport for London has already upgraded the Jubilee and Victoria lines and significant progress is being made on the Northern line and also with the delivery of new trains, tracks and signals for the sub-surface railway – the Metropolitan, Hammersmith and City, District and Circle lines. Upg
August 13, 2013 Read time: 2 mins
London’s Tube network now carries over a billion passengers a year and demand keeps growing. Much of the infrastructure is very old, some dating back to the 1860s, so a major upgrade to increase capacity is essential. 1466 Transport for London has already upgraded the Jubilee and Victoria lines and significant progress is being made on the Northern line and also with the delivery of new trains, tracks and signals for the sub-surface railway – the Metropolitan, Hammersmith and City, District and Circle lines. Upgrades on the remaining ‘deep tube’ lines – the Bakerloo, Central, Piccadilly and Waterloo and City – lie ahead.

The forthcoming Institution of Engineering and Technology (IET) London Area meeting on 4 September will feature a talk by Andy Guest, London Underground’s chief programme engineer for the Deep Tube Programme.  The talk will discuss the feasibility stage of this project, and give an insight into the challenges posed by bringing world-class engineering and new technology to an infrastructure introduced in the 19th century.

Venue is the Adelaide pub, Park Road, Teddington, TW11 0AU at 7pm.

For more information on companies in this article

Related Content

  • C/AVs could mean cheaper roads
    October 28, 2019
    The safety benefits of C/AVs have long been promoted – but research suggests they should also contribute to cheaper roads. David Crawford investigates the potential benefits in infrastructure costs Building narrower freeway lanes to accommodate the enhanced route-tracking capabilities of connected and autonomous vehicles (C/AVs), running in platoon conditions, could result in cost savings of £0.5 million (€0.56 million or US$6.5 million) for every km of road length built. Such benefits could be secur
  • ‘Shining moment of opportunity for tolling’
    May 5, 2021
    Climate change is already affecting tolling operations in many parts of the world. IBTTA’s Bill Cramer explains how the sector can be seen as a proven funding and financing mechanism for surface transportation
  • Oxford Circus will become 'pedestrian friendly' 
    June 22, 2021
    Congestion at UK capital hotspot is unsustainable, says Westminster City Council 
  • Thales to supply communications systems for Hyderabad Metro Rail
    December 11, 2012
    Thales India has been appointed by engineering and construction company Larsen & Toubro to provide Communications Based Train Control (CBTC) and Integrated Communications and Supervision (ICS) systems for the Hyderabad Metro rail project, to be implemented on rail lines 1, 2 and 3, covering 72 km of rail and comprising of 66 stations. Thales will design, build, deliver and manage the installation of its SelTrac Communications-Based Train Control solution, which is already in use by more than thirty of the w