Skip to main content

New signalling technology for Circle and Hammersmith & City Lines 2018

Thales has tested a new signalling control system on sub-surface trains on the Circle and Hammersmith & City lines, which enable trains to run closer together. The test aims to provide a more frequent service, reduce waiting times and help boost capacity for the Circle, District, Hammersmith & City and Metropolitan lines. The system will go live on the first section of the network as early as 2018.
October 17, 2017 Read time: 2 mins

596 Thales has tested a new signalling control system on sub-surface trains on the Circle and Hammersmith & City lines, which enable trains to run closer together. The test aims to provide a more frequent service, reduce waiting times and help boost capacity for the Circle, District, Hammersmith & City and Metropolitan lines. The system will go live on the first section of the network as early as 2018.

Further testing weekends will commence in the coming months as the system is being progressively installed across more of the network with a capacity increase of up to 33% across all four lines, which makes up 40% of the underground. It will also mean that Night Tube services can be introduced on these lines in the future.

The system is designed with the intention of reducing the number of signalling problems and improve the accuracy of real-time customer information. Services will begin to increase in frequency from 2021 when more of the network is operating the new system, and all four lines will be using the system by 2023.

Testing took place between Hammersmith and Latimer Road and featured three newly-enabled S Stock Trains. It involved using a signalling system to manage the distance between trains. The new S Stock trains are currently having new equipment installed, with 30 already fitted by 513 Bombardier.

The next testing weekend will start in December, with installation work continuing throughout the year.

Related Content

  • September 6, 2017
    Thales wins third LRT contract in Taiwan
    Thales has been awarded its third LRT contract in Taiwan by the China Steel Corporation. The Ankeng LRT project is part of the New Taipei City Department of Rapid Transit Systems transportation expansion plan in the Greater Taipei region that aims to reduce travelling time between regions and to alleviate the busy traffic volume within the metropolitan area.The Ankeng LRT line will be one of the new lines connecting passengers coming from other districts
  • March 28, 2017
    Malaysian LRT line orders more Bombardier trains
    Rail technology specialist Bombardier Transportation and its local partner Hartasuma are to deliver an additional 27 Bombardier Innovia Metro 300 trains for the Kelana Jaya Light Rail Transit (LRT) Line in Malaysia. The order from Prasarana Malaysia Berhad is valued at approximately US$388 million (1.7 billion Malaysian ringgit). The lightweight aluminium Innovia Metro 300 trains can move up to 30,000 passengers per hour, per direction. Once final delivery is completed in 2022, these four-car trains will
  • October 28, 2016
    Vision 2016 highlights the latest trends and technology in machine vision
    The Vision Show is the perfect venue to catch up with the latest moves, trends and launches in the traffic vision sector, and ITS International editor Colin Sowman highlights a few to start with…
  • October 17, 2019
    How can US transportation be ‘re-envisioned’?
    In her address to this year’s ITS America Annual Meeting, congresswoman Eleanor Holmes Norton, chair of the House Subcommittee on Highways and Transit, called for a ‘re-envisioning’ of transportation. Her speech is below – and ITS International asks a number of US experts what they would like to see ‘re-envisioned’…

    I would like to welcome  ITS America to the nation’s capital.