Skip to main content

New Port Mann Bridge opens to eight lanes of traffic

Canada’s British Columbia (BC) government is delivering on its commitment to reduce congestion along the province’s busiest transportation corridor, with the opening of the new Port Mann Bridge to eight lanes of traffic, which cuts commute times and allows for the first regular transit service across the bridge in twenty-five years. This is the largest transportation project in BC history and completes the first and largest phase of the Port Mann/Highway 1 Improvement Project, which includes highway widenin
December 6, 2012 Read time: 3 mins
Canada’s British Columbia (BC) government is delivering on its commitment to reduce congestion along the province’s busiest transportation corridor, with the opening of the new Port Mann Bridge to eight lanes of traffic, which cuts commute times and allows for the first regular transit service across the bridge in twenty-five years.

This is the largest transportation project in BC history and completes the first and largest phase of the Port Mann/Highway 1 Improvement Project, which includes highway widening from 202 Street in Langley to Brunette Avenue in Coquitlam, opening eight lanes on the new bridge, and rebuilding interchanges from 176 Street in Surrey to Cape Horn in Coquitlam.

Premier Christy Clark officially opened the new bridge, saying, “As we officially open the Port Mann Bridge we are eliminating one of the worst traffic bottlenecks in British Columbia.  After years of waiting, drivers get to enjoy a faster, more efficient commute and will have more time to spend with their family instead of sitting in an idling car.”

The new bridge is said to be the widest bridge in the world; the largest and longest main span river crossing in Western Canada; the second longest (by mere metres) in North America and the 29th longest in the world.

Three years ago, the government of BC set a target of opening the Port Mann Bridge in December 2012, and on 1 December 2012, the bridge was opened and drivers started enjoying the benefits of nearly four years of bridge and Highway 1 construction.
 
“This is the day we’ve been waiting for, as the new Port Mann Bridge officially opens to eight lanes of traffic and motorists can start to save some valuable time on their commutes,” said Transportation and Infrastructure Minister Mary Polak. “It’s a day almost a decade in the making, from the first consultation to the final line painting, and I want to thank everyone who has laboured on this project.”
 
Some drivers can expect to cut their commutes in half, and save as much as an hour per day. Car-poolers and HOV users will enjoy the benefits of new on and off ramps and dedicated HOV lanes from Langley to Vancouver. For the first time in twenty-five years, a reliable bus service will be able to cross the Port Mann Bridge, with ExpressBus connecting the new Carvolth Exchange in Langley to Braid Station in New Westminster in about twenty minutes.  
 
The on-time and on-budget opening of the new Port Mann Bridge is a major milestone for the Port Mann/Highway 1 Improvement Project, and the centrepiece of 37 kilometres of upgrades to one of British Columbia’s most important economic corridors.

Construction will continue on the Port Mann Bridge and along the Highway 1 corridor through 2013, to complete the bridge to its full ten-lane capacity and continue highway widening and interchange improvements through Coquitlam, Burnaby and Vancouver.

Related Content

  • Turkey’s Gebze-Izmir motorway gets under way
    July 17, 2015
    Gebze İzmir İşletme ve Bakım (GİİB) has begun work on the 22-year contract for the Gebze-Izmir motorway in Turkey and will be responsible for pre-operational services, operation, maintenance and toll management on behalf of Otoyol, the concessionaire for the Turkish General Directorate of Highways (KGM). Egis is a 50 per cent shareholder in GIIB, along with shareholders of the concession company. The Gebze-İzmir project is a toll motorway procured by KGM under a build, operate and transfer (BOT) model.
  • Big data analytics identifies congestion increases
    November 26, 2014
    Iteris has completed and published the Alameda County Transportation Commission (Alameda CTC) 2014 Level of Service Monitoring Report. The report was generated for speed-based congestion monitoring, utilising big data analytics in place of conventional in-field manual data collection for 205 miles of the 327 mile network. Use of big data analytics will be expanded in future monitoring cycles. Many agencies conduct congestion monitoring through manual data collection efforts. Agencies traditionally us
  • EIB agrees backing to upgrade Scotland’s core motorway network
    February 25, 2014
    The European Investment Bank (EIB) has agreed to provide a funding contribution of US$292 million towards the completion of the motorway link between Glasgow and Edinburgh. The project includes the completion of the M8 motorway between Scotland’s two largest cities and major improvements to the M73 and M74 to reduce congestion and safety and improve travel times on one of Scotland’s busiest road networks. “The European Investment Bank is committed to supporting crucial investment in essential infrast
  • IBTTA summit hits right notes in Salzburg
    December 5, 2018
    In the birthplace of Mozart, Colin Sowman found that delegates at the IBTTA’s inaugural World Tolling Summit were playing a variety of interesting tunes The first World Tolling Summit took place in Salzburg, Austria this autumn. Created and organised by the International Bridge Tolling and Turnpike Association (IBTTA), the event was supported by its European counterpart Asecap and hosted by Austria’s tolling authority, Asfinag. The transfer of views, experience and practice both ways across the Atl