Skip to main content

New Port Mann Bridge opens to eight lanes of traffic

Canada’s British Columbia (BC) government is delivering on its commitment to reduce congestion along the province’s busiest transportation corridor, with the opening of the new Port Mann Bridge to eight lanes of traffic, which cuts commute times and allows for the first regular transit service across the bridge in twenty-five years. This is the largest transportation project in BC history and completes the first and largest phase of the Port Mann/Highway 1 Improvement Project, which includes highway widenin
December 6, 2012 Read time: 3 mins
Canada’s British Columbia (BC) government is delivering on its commitment to reduce congestion along the province’s busiest transportation corridor, with the opening of the new Port Mann Bridge to eight lanes of traffic, which cuts commute times and allows for the first regular transit service across the bridge in twenty-five years.

This is the largest transportation project in BC history and completes the first and largest phase of the Port Mann/Highway 1 Improvement Project, which includes highway widening from 202 Street in Langley to Brunette Avenue in Coquitlam, opening eight lanes on the new bridge, and rebuilding interchanges from 176 Street in Surrey to Cape Horn in Coquitlam.

Premier Christy Clark officially opened the new bridge, saying, “As we officially open the Port Mann Bridge we are eliminating one of the worst traffic bottlenecks in British Columbia.  After years of waiting, drivers get to enjoy a faster, more efficient commute and will have more time to spend with their family instead of sitting in an idling car.”

The new bridge is said to be the widest bridge in the world; the largest and longest main span river crossing in Western Canada; the second longest (by mere metres) in North America and the 29th longest in the world.

Three years ago, the government of BC set a target of opening the Port Mann Bridge in December 2012, and on 1 December 2012, the bridge was opened and drivers started enjoying the benefits of nearly four years of bridge and Highway 1 construction.
 
“This is the day we’ve been waiting for, as the new Port Mann Bridge officially opens to eight lanes of traffic and motorists can start to save some valuable time on their commutes,” said Transportation and Infrastructure Minister Mary Polak. “It’s a day almost a decade in the making, from the first consultation to the final line painting, and I want to thank everyone who has laboured on this project.”
 
Some drivers can expect to cut their commutes in half, and save as much as an hour per day. Car-poolers and HOV users will enjoy the benefits of new on and off ramps and dedicated HOV lanes from Langley to Vancouver. For the first time in twenty-five years, a reliable bus service will be able to cross the Port Mann Bridge, with ExpressBus connecting the new Carvolth Exchange in Langley to Braid Station in New Westminster in about twenty minutes.  
 
The on-time and on-budget opening of the new Port Mann Bridge is a major milestone for the Port Mann/Highway 1 Improvement Project, and the centrepiece of 37 kilometres of upgrades to one of British Columbia’s most important economic corridors.

Construction will continue on the Port Mann Bridge and along the Highway 1 corridor through 2013, to complete the bridge to its full ten-lane capacity and continue highway widening and interchange improvements through Coquitlam, Burnaby and Vancouver.

Related Content

  • New York to pilot cordon-based congestion charging
    March 16, 2012
    From 2009, if all goes to plan, New York will run a three-year cordon-based congestion charging pilot - the first in the US. Upon accession, US Secretary of Transportation Mary Peters signalled her intention to continue her predecessor Norman Mineta's initiative to specifically target road congestion. And, with initiatives such as the US Department of Transportation's (USDOT's) Urban Partnership Program actively promoting tolling as a part of a compound solution to the problem, the way was opened for the co
  • Carbon finance delivers critical support to mass transit schemes
    February 2, 2012
    David Crawford investigates carbon finance in transport. World Bank carbon finance grants are delivering critical support to major mass transit deployments in emerging and developing economies. Only recently operative in the transport sector, the Clean Development Mechanism (CDM, see panel) is designed to generate additional income streams and improve internal rates of return on projects funded from public- and private-sector sources.
  • Bulgaria to get Europe’s longest road tunnel
    March 13, 2014
    The longest road tunnel in Europe will be built along the new 65 kilometre stretch of the Struma highway in Bulgaria. Two tunnels, totalling almost 37 kilometres, will be built underneath the Kresna gorge between the towns of Blagoevgrad and Sandanski. The 150 kilometre Struma highway runs from the village of Daskalovo to the Greek border and is part of the Pan-European Transport Corridor IV and the Trans-European North-South Highway. The tunnels are required for environmental reasons and will be
  • Siemens provides technology for Las Vegas connected vehicle pilot
    January 8, 2018
    To combat the rise in 55 pedestrian fatalities to 74 in Las Vegas from December 2016, Siemens, Brandmotion and Commsignia will provide a turnkey Vehicle-to-infrastructure (V2I) and Vehicle-to-Vehicle solution along Casino Center Boulevard between Bonneville and Clark Avenues. It will become one of the initial corridors within the City’s connected vehicle technology pilot with a focus on pedestrian safety and corridor notifications. The technology includes roadside and vehicle infrastructure, innovative