Skip to main content

New Port Mann Bridge opens to eight lanes of traffic

Canada’s British Columbia (BC) government is delivering on its commitment to reduce congestion along the province’s busiest transportation corridor, with the opening of the new Port Mann Bridge to eight lanes of traffic, which cuts commute times and allows for the first regular transit service across the bridge in twenty-five years. This is the largest transportation project in BC history and completes the first and largest phase of the Port Mann/Highway 1 Improvement Project, which includes highway widenin
December 6, 2012 Read time: 3 mins
Canada’s British Columbia (BC) government is delivering on its commitment to reduce congestion along the province’s busiest transportation corridor, with the opening of the new Port Mann Bridge to eight lanes of traffic, which cuts commute times and allows for the first regular transit service across the bridge in twenty-five years.

This is the largest transportation project in BC history and completes the first and largest phase of the Port Mann/Highway 1 Improvement Project, which includes highway widening from 202 Street in Langley to Brunette Avenue in Coquitlam, opening eight lanes on the new bridge, and rebuilding interchanges from 176 Street in Surrey to Cape Horn in Coquitlam.

Premier Christy Clark officially opened the new bridge, saying, “As we officially open the Port Mann Bridge we are eliminating one of the worst traffic bottlenecks in British Columbia.  After years of waiting, drivers get to enjoy a faster, more efficient commute and will have more time to spend with their family instead of sitting in an idling car.”

The new bridge is said to be the widest bridge in the world; the largest and longest main span river crossing in Western Canada; the second longest (by mere metres) in North America and the 29th longest in the world.

Three years ago, the government of BC set a target of opening the Port Mann Bridge in December 2012, and on 1 December 2012, the bridge was opened and drivers started enjoying the benefits of nearly four years of bridge and Highway 1 construction.
 
“This is the day we’ve been waiting for, as the new Port Mann Bridge officially opens to eight lanes of traffic and motorists can start to save some valuable time on their commutes,” said Transportation and Infrastructure Minister Mary Polak. “It’s a day almost a decade in the making, from the first consultation to the final line painting, and I want to thank everyone who has laboured on this project.”
 
Some drivers can expect to cut their commutes in half, and save as much as an hour per day. Car-poolers and HOV users will enjoy the benefits of new on and off ramps and dedicated HOV lanes from Langley to Vancouver. For the first time in twenty-five years, a reliable bus service will be able to cross the Port Mann Bridge, with ExpressBus connecting the new Carvolth Exchange in Langley to Braid Station in New Westminster in about twenty minutes.  
 
The on-time and on-budget opening of the new Port Mann Bridge is a major milestone for the Port Mann/Highway 1 Improvement Project, and the centrepiece of 37 kilometres of upgrades to one of British Columbia’s most important economic corridors.

Construction will continue on the Port Mann Bridge and along the Highway 1 corridor through 2013, to complete the bridge to its full ten-lane capacity and continue highway widening and interchange improvements through Coquitlam, Burnaby and Vancouver.

Related Content

  • Atkins named lead designer for major freeway project in Nevada
    December 14, 2015
    Atkins North America is to play a key role in the development of a freeway that aims to boost safety, mobility and accessibility in Las Vegas. Considered the most important and ambitious project in Nevada Department of Transportation's (NDOT) history, it also accommodates regional economic redevelopment through improved access to downtown Las Vegas and the Resort Corridor. As design lead on the team led by Kiewit Infrastructure West, Atkins will manage all design and engineering services for NDOT’s Pr
  • IRD wins WIM sorter system contract
    May 16, 2012
    International Road Dynamics (IRD) has received a contract valued at approximately US$1.22 million from Canada's Prince Edward Island Department of Transportation and Infrastructure Renewal (PEI DTIR). The contract is for the supply, installation, and maintenance of a mainline weigh-in-motion (WIM) sorter system, and will complement the weigh station operation located 1 km east bound of the Confederation Bridge. Installation is scheduled for completion by the end of June 2011.
  • Siemens to equip Turkey’s suspension bridge with traffic control technology
    September 28, 2012
    Siemens is to supply the traffic control system for the world’s fourth longest suspension bridge, to be built between Istanbul and Izmir in Turkey. Siemens will be responsible for the development, installation and commissioning of all components and systems for the traffic control technology, including the traffic control system, monitoring technology and components for the technical infrastructure such as communication and camera equipment, energy supply, lighting and ventilation. Siemens will also supply
  • Aarsleff to build tunnels on new Danish railway
    February 7, 2014
    Banedanmark (Rail Net Denmark) has awarded construction company Per Aarsleff a US$ 166.66 million contract to build two tunnels on the 3.7 km tunnel of the new railway route between Copenhagen and Ringsted. The project will be carried out as a turnkey contract during the next three years with expected completion in the spring of 2017. The two tunnels, of 560 metres and 695 metres respectively, are to be carried out as cut and cover tunnels built on site in open excavations down to a depth of 11 met