Skip to main content

New Port Mann Bridge opens to eight lanes of traffic

Canada’s British Columbia (BC) government is delivering on its commitment to reduce congestion along the province’s busiest transportation corridor, with the opening of the new Port Mann Bridge to eight lanes of traffic, which cuts commute times and allows for the first regular transit service across the bridge in twenty-five years. This is the largest transportation project in BC history and completes the first and largest phase of the Port Mann/Highway 1 Improvement Project, which includes highway widenin
December 6, 2012 Read time: 3 mins
Canada’s British Columbia (BC) government is delivering on its commitment to reduce congestion along the province’s busiest transportation corridor, with the opening of the new Port Mann Bridge to eight lanes of traffic, which cuts commute times and allows for the first regular transit service across the bridge in twenty-five years.

This is the largest transportation project in BC history and completes the first and largest phase of the Port Mann/Highway 1 Improvement Project, which includes highway widening from 202 Street in Langley to Brunette Avenue in Coquitlam, opening eight lanes on the new bridge, and rebuilding interchanges from 176 Street in Surrey to Cape Horn in Coquitlam.

Premier Christy Clark officially opened the new bridge, saying, “As we officially open the Port Mann Bridge we are eliminating one of the worst traffic bottlenecks in British Columbia.  After years of waiting, drivers get to enjoy a faster, more efficient commute and will have more time to spend with their family instead of sitting in an idling car.”

The new bridge is said to be the widest bridge in the world; the largest and longest main span river crossing in Western Canada; the second longest (by mere metres) in North America and the 29th longest in the world.

Three years ago, the government of BC set a target of opening the Port Mann Bridge in December 2012, and on 1 December 2012, the bridge was opened and drivers started enjoying the benefits of nearly four years of bridge and Highway 1 construction.
 
“This is the day we’ve been waiting for, as the new Port Mann Bridge officially opens to eight lanes of traffic and motorists can start to save some valuable time on their commutes,” said Transportation and Infrastructure Minister Mary Polak. “It’s a day almost a decade in the making, from the first consultation to the final line painting, and I want to thank everyone who has laboured on this project.”
 
Some drivers can expect to cut their commutes in half, and save as much as an hour per day. Car-poolers and HOV users will enjoy the benefits of new on and off ramps and dedicated HOV lanes from Langley to Vancouver. For the first time in twenty-five years, a reliable bus service will be able to cross the Port Mann Bridge, with ExpressBus connecting the new Carvolth Exchange in Langley to Braid Station in New Westminster in about twenty minutes.  
 
The on-time and on-budget opening of the new Port Mann Bridge is a major milestone for the Port Mann/Highway 1 Improvement Project, and the centrepiece of 37 kilometres of upgrades to one of British Columbia’s most important economic corridors.

Construction will continue on the Port Mann Bridge and along the Highway 1 corridor through 2013, to complete the bridge to its full ten-lane capacity and continue highway widening and interchange improvements through Coquitlam, Burnaby and Vancouver.

Related Content

  • March 9, 2017
    Fitch: Smooth ride so far for US managed lanes
    Managed lanes throughout the US are off to a good start in 2017, according to Fitch Ratings in its latest managed lanes peer review. Actual performance is so far exceeding Fitch’s rating case for the sector as a whole, with 95 Express in Northern Virginia and NTE (segments 1 and 2) in Texas proving to be notable examples. Also boosting long-term prospects for managed lanes is the performance on the longest operating facility, SR-91 in Orange County, California. This state road is seeing strong compound a
  • September 26, 2014
    Communication is key to I-80 implementation
    The I-80 Smart Corridor is to use 133 energy-saving, low-light-pollution signs on the 31.4km (19.5miles) route between the Oakland Bay Bridge and the Carquinez Bridge in California. Due to open next year, the US$80m project will see adaptive metering at 44 on-ramps (with bus priority and HOV bypass) and the new signs will be used for lane management and to advise drivers of incidents and variable speed limits. The system will be managed from a centralised control room in Oakland and the traffic signa
  • September 22, 2016
    Highway upgrade features Australian first intersection design
    A new interchange design to improve traffic management will be a key part of a major Queensland, Australia road project, with the contract awarded today for a US$712 million (AU$929.3 million) upgrade to the Bruce Highway between Caloundra Road and the Sunshine Motorway. Minister for Infrastructure and Transport Darren Chester and Queensland Main Roads Minister Mark Bailey today announced a Fulton Hogan Seymour Whyte joint venture had won the contract for the project, which aims to ultimately reduce cong
  • October 1, 2014
    Consortium lands Mexico highway concession
    A consortium led by Mota-Engil has won a tender for the construction and operation of a stretch of Mexico's Tuxpan-Tampico highway. The Tuxpan-Tampico highway links two of Mexico's busiest Gulf coast ports and will be the first project in the country to be developed under the public-private partnership (PPP) law's unsolicited proposal provision. The project involves the construction of a highway south of the city of Tuxpan, from the junction with the Tihuatlán-Tuxpan highway to the connection with the