Skip to main content

New Port Mann Bridge opens to eight lanes of traffic

Canada’s British Columbia (BC) government is delivering on its commitment to reduce congestion along the province’s busiest transportation corridor, with the opening of the new Port Mann Bridge to eight lanes of traffic, which cuts commute times and allows for the first regular transit service across the bridge in twenty-five years. This is the largest transportation project in BC history and completes the first and largest phase of the Port Mann/Highway 1 Improvement Project, which includes highway widenin
December 6, 2012 Read time: 3 mins
Canada’s British Columbia (BC) government is delivering on its commitment to reduce congestion along the province’s busiest transportation corridor, with the opening of the new Port Mann Bridge to eight lanes of traffic, which cuts commute times and allows for the first regular transit service across the bridge in twenty-five years.

This is the largest transportation project in BC history and completes the first and largest phase of the Port Mann/Highway 1 Improvement Project, which includes highway widening from 202 Street in Langley to Brunette Avenue in Coquitlam, opening eight lanes on the new bridge, and rebuilding interchanges from 176 Street in Surrey to Cape Horn in Coquitlam.

Premier Christy Clark officially opened the new bridge, saying, “As we officially open the Port Mann Bridge we are eliminating one of the worst traffic bottlenecks in British Columbia.  After years of waiting, drivers get to enjoy a faster, more efficient commute and will have more time to spend with their family instead of sitting in an idling car.”

The new bridge is said to be the widest bridge in the world; the largest and longest main span river crossing in Western Canada; the second longest (by mere metres) in North America and the 29th longest in the world.

Three years ago, the government of BC set a target of opening the Port Mann Bridge in December 2012, and on 1 December 2012, the bridge was opened and drivers started enjoying the benefits of nearly four years of bridge and Highway 1 construction.
 
“This is the day we’ve been waiting for, as the new Port Mann Bridge officially opens to eight lanes of traffic and motorists can start to save some valuable time on their commutes,” said Transportation and Infrastructure Minister Mary Polak. “It’s a day almost a decade in the making, from the first consultation to the final line painting, and I want to thank everyone who has laboured on this project.”
 
Some drivers can expect to cut their commutes in half, and save as much as an hour per day. Car-poolers and HOV users will enjoy the benefits of new on and off ramps and dedicated HOV lanes from Langley to Vancouver. For the first time in twenty-five years, a reliable bus service will be able to cross the Port Mann Bridge, with ExpressBus connecting the new Carvolth Exchange in Langley to Braid Station in New Westminster in about twenty minutes.  
 
The on-time and on-budget opening of the new Port Mann Bridge is a major milestone for the Port Mann/Highway 1 Improvement Project, and the centrepiece of 37 kilometres of upgrades to one of British Columbia’s most important economic corridors.

Construction will continue on the Port Mann Bridge and along the Highway 1 corridor through 2013, to complete the bridge to its full ten-lane capacity and continue highway widening and interchange improvements through Coquitlam, Burnaby and Vancouver.

Related Content

  • HOV lanes are Paris Olympics legacy
    November 28, 2024
    There’s a new high-occupancy vehicle lane on the Paris Périphérique: Francois Leblanc of Fareco tells Adam Hill about winning the race to put this technology in place
  • Nothing smart about ‘deadly’ lay-bys on all-lane running motorways, says AA
    September 27, 2016
    Eight out of 10 UK drivers think that removal of hard-shoulders on smart motorways has made motorways more dangerous than four years ago, according to an AA-Populus poll of 20,845 drivers. Some drivers even refer to the lay-bys on these motorways as ‘death zones’.
  • House proposes US$10.5 billion eight-month highway bill
    July 10, 2014
    The US Government House Ways and Means Committee is proposing a US$10.5 billion, eight-month transportation funding bill to push the debate over road and transit spending into the next Congress. The proposal, which calls for a temporary extension of current transportation funding levels until 31 May 2015, comes as lawmakers try to come up with a way to replenish the Department of Transportation's depleted Highway Trust Fund before a predicted August bankruptcy date. The traditional funding source fo
  • Adaptive traffic control drives financial benefits
    July 24, 2012
    Prof. Klaus Banse, President of ITS Colombia and Ing. Robert Miranda, Head of the Traffic Management and Control System of Cartagena de Indias, Columbia, outline early cost benefits of an adaptive traffic control system. At the beginning of this year, Cartagena de Indias, located on the north coast of Colombia in the Caribbean, implemented a new adaptive traffic control system on 52 intersections with an investment of US$4.5 million.