Skip to main content

New Mexico City airport 'the most advanced worldwide'

The new international airport being built in Mexico City is "probably the most advanced modern airport project worldwide," Dr Bernardo Lisker, international director of The Mitre Corporation, has said. "This is an enormously important project for Mexico, without which the nation's economy would suffer a bottleneck very soon," said Lisker, who will be discussing the technical vision of the airport at BNamericas' Mexico Infrastructure Summit taking place 18–19 February. "Building the new airport in the
February 13, 2015 Read time: 2 mins

The new international airport being built in Mexico City is "probably the most advanced modern airport project worldwide," Dr Bernardo Lisker, international director of The Mitre Corporation, has said.

"This is an enormously important project for Mexico, without which the nation's economy would suffer a bottleneck very soon," said Lisker, who will be discussing the technical vision of the airport at BNamericas' Mexico Infrastructure Summit taking place 18–19 February.

"Building the new airport in the Texcoco area was by far the best alternative," Lisker added. "It will be the first airport in Latin America with simultaneous traffic flow to and from more than one airstrip, and it will be the world's first outside of the US to handle three traffic flows simultaneously."

Costing US$12.5 billion and to be located on a 4,600 hectare site, work on the airport began at the end of December, with developers focusing initially on building access roads and drainage infrastructure, and last month a consortium led by Dutch company Netherlands Airport Consultants (NAICM) won a contract to build runways and platforms and supply navigation equipment, among others.

According to the plans of the communications and transport ministry (SCT), tenders for the construction of the new airport buildings are expected to be published shortly. The first phase of construction includes a new terminal, control tower, 95 gates and three runways with capacity to handle up to 50 million passengers a year.

When complete, the new airport will have six runways and capacity of 120 million passengers a year. The existing Mexico City airport AICM can handle up to 32 million passengers a year but is close to reaching capacity.

Related Content

  • Flexible, demand-based parking charges ease parking problems
    April 10, 2012
    Innovative parking initiatives on the US Pacific Coast. David Crawford reviews. Californian cities are leading the way in trialling new solutions to their endemic parking problems. According to Donald Shoup, a professor of urban planning at the University of California in Los Angeles, drivers looking for available spots can cause up to 74% of traffic congestion in downtown areas. One solution is variable, demand-responsive pricing of parking.
  • The sunshine subsidy for Colorado’s tollways
    January 10, 2014
    David Crawford reports on energy cost cutting on US highways. Just over a year after switch-on and with two global awards under its belt, the longest solar-powered toll road in the US is generating heightened interest in highway applications of alternative energy. The E-407, which loops around the eastern perimeter of the Denver metropolitan area in Colorado, won the International Bridge, Tunnel and Turnpike Association (IBTTA) President’s Overall Award for Excellence at its September 2013 Annual Meeting in
  • Strabag wins Polish bypass contract
    September 11, 2014
    A consortium of Strabag and its subsidiary Heilit and Woerner has been awarded a US$51.7 million design-and-build contract for a 7.6 kilometre bypass around the city of Kościerzyna in northern Poland. The project comprises the construction of three traffic lanes with one additional lane that can be adapted for traffic if needed. It also includes nine civil engineering structures, including bridges and a railway overpass; environmental protection measures such as noise barriers and wildlife crossings; a
  • Fluor and partners to build and operate LAX Automated People Mover
    March 25, 2019
    Fluor and its partners are to construct and operate the Los Angeles International Airport’s (LAX) Automated People Mover, a project valued $4.9 billion, over the next 30 years. The announcement follows the completion of a pre-construction phase carried out by Fluor and its LAX Integrated Express Solutions (LINXS) team on behalf of Los Angeles World Airports. The line is expected to offer a rider capacity of up to 10,000 passengers per hour once it is operational in 2023. Terence Easton, president