Skip to main content

New Mexico City airport 'the most advanced worldwide'

The new international airport being built in Mexico City is "probably the most advanced modern airport project worldwide," Dr Bernardo Lisker, international director of The Mitre Corporation, has said. "This is an enormously important project for Mexico, without which the nation's economy would suffer a bottleneck very soon," said Lisker, who will be discussing the technical vision of the airport at BNamericas' Mexico Infrastructure Summit taking place 18–19 February. "Building the new airport in the
February 13, 2015 Read time: 2 mins

The new international airport being built in Mexico City is "probably the most advanced modern airport project worldwide," Dr Bernardo Lisker, international director of The Mitre Corporation, has said.

"This is an enormously important project for Mexico, without which the nation's economy would suffer a bottleneck very soon," said Lisker, who will be discussing the technical vision of the airport at BNamericas' Mexico Infrastructure Summit taking place 18–19 February.

"Building the new airport in the Texcoco area was by far the best alternative," Lisker added. "It will be the first airport in Latin America with simultaneous traffic flow to and from more than one airstrip, and it will be the world's first outside of the US to handle three traffic flows simultaneously."

Costing US$12.5 billion and to be located on a 4,600 hectare site, work on the airport began at the end of December, with developers focusing initially on building access roads and drainage infrastructure, and last month a consortium led by Dutch company Netherlands Airport Consultants (NAICM) won a contract to build runways and platforms and supply navigation equipment, among others.

According to the plans of the communications and transport ministry (SCT), tenders for the construction of the new airport buildings are expected to be published shortly. The first phase of construction includes a new terminal, control tower, 95 gates and three runways with capacity to handle up to 50 million passengers a year.

When complete, the new airport will have six runways and capacity of 120 million passengers a year. The existing Mexico City airport AICM can handle up to 32 million passengers a year but is close to reaching capacity.

Related Content

  • US transportation secretary supports Infrastructure Week
    May 12, 2015
    In support of the third annual Infrastructure Week, US Transportation Secretary Anthony Foxx is participating in events in Washington and will then head out to meet with state and local leaders, business leaders and academics in Tennessee, California, and Iowa. “Our nation’s economy and the way we live both depend on having strong infrastructure,” Secretary Foxx said. “But the truth is that our current levels of investment are falling short of what is needed just to keep our existing system safe and in g
  • Highway 99 revisited
    May 2, 2024
    The effects of Covid are still being felt. David Arminas considers how the pandemic has affected toll revenue on Seattle’s newish SR99 tunnel – and looks at the traffic management and emergency plans in place for drivers
  • Dutch strike public/private balance to introduce C-ITS services
    November 15, 2017
    Connected-ITS applications are due to appear on a nation-wide scale this summer, through the Netherlands’ Talking Traffic Partnership – if all goes to plan. Jon Masters reports. The Netherlands’ Talking Traffic Partnership (TTP) looks almost too good to be true: an artificial market set up and supported by national, regional and local government to accelerate deployment of Connected ITS (C-ITS) applications. If it does have any serious flaws, these are going to become apparent quite soon, because the first
  • Thales to modernise Egyptian railways signalling systems
    May 29, 2013
    In a contract valued at over US$141 million with Egyptian National Railways, Thales is to modernise the signalling systems on the Cairo-Alexandria corridor. The Cairo-Alexandria railway line is approximately 208 km long and is currently the busiest section of the Egyptian Railways network, carrying more than 25 million passengers per year. The turnkey contract includes design, supply, construction, phasing, commissioning and maintenance services. It covers the modernisation of the signalling as well as the