Skip to main content

New EV chargers from ABB

Switzerland based ABB has launched the Terra SmartConnect (SC) fast chargers for electric vehicles (EV) in North America. Terra SC will be available with support for the CHAdeMO fast-charging standard, with SAE/combined charging system and will be made available in the Americas in second quarter of 2013. According to the company, the Terra SC can fully charge an electric car in thirty to 120 minutes and charge the battery of currently available EVs from 30 per cent to 80 per cent in about half an hour. The
April 12, 2013 Read time: 2 mins
Terra SC will be available with support for the CHAdeMO fast-charging standard, with SAE/combined charging system and will be made available in the Americas in second quarter of 2013.

According to the company, the Terra SC can fully charge an electric car in thirty to 120 minutes and charge the battery of currently available EVs from 30 per cent to 80 per cent in about half an hour.  The fast chargers come with an outdoor-rated steel housing, a full-colour, eight inch, touch-screen user interface, smart connectivity features and wall-mount connections.  Features include remote assistance, management, and servicing with smart software upgradeability.

Additionally, the charger has optional features of RFiD and PIN code authorisation, as well as a web-based statistics module with data per user to support energy usage reporting.

The company has also launched the Terra 53, the first 50-kilowatts (kW) CCS DC fast charging station said to be compliant with 1731 BMW i3, 994 Volkswagen e-up! and e-Golf, as well as other CCS cars expected to be available autumn 2013 onwards.

The Terra 53 C is the first product configuration from a family of DC charging stations supporting the CCS standard. The Terra 53 C will be available for deliveries throughout Europe from summer 2013. From autumn 2013 dual outlet configurations will also be available, in the same compact form, for the German market supporting both CCS and type 2 mode 3 fast AC charging.

With a convenient fifteen to thirty minutes charging time, the cloud connected Terra 53 is compatible with any charging network or payment and billing platform through open standards based interfaces, such as the widely adopted open charge point protocol (OCPP), enabling easy and secure payments via smart-phone, parking management terminals, RFID or pin code access.

Features include remote monitoring, pro-active maintenance and functional upgrades, providing customers with the tools necessary to gather customer specific usage statistics and reports.

Related Content

  • April 25, 2013
    Widest bridge in the world Port Mann open in Vancouver
    Port Mann Bridge, designed to growing regional congestion and improve the movement of people, goods and transit throughout greater Vancouver, is now open for business. The widest bridge in the world, the Port Mann Bridge located in the metro Vancouver area, in British Columbia, Canada, features an Open Road Tolling (ORT) system, also called All Electronic Tolling (AET), which will ultimately cross all 10 lanes of traffic.
  • November 22, 2017
    Cyber switching launch enhanced configuration on EV master controller to manage power
    Cyber Switching Electric Vehicle Master Controller (EVMC) has released a direct input product configuration which aims to enhance capability during daytime high-demand/high–turnover charge station applications. It is designed with the intention providing electric vehicle (EV) fleet managers with more options to meet their charging needs while realizing the cost savings from managing power to charging stations. The controller, through the direct input design, can be connected to up to four independent input
  • November 15, 2018
    Greenlots and Volvo Trucks to install EV chargers in California
    Technology company Greenlots has partnered with Volvo Trucks to implement an electric vehicle (EV) charging infrastructure for fleets operating out of warehouses in southern California. The project is part of a public-private partnership, in which the California Air Resources Board (CARB) awarded $44.8 million to the South Coast Air Quality Management District. The funded was used for Volvo’s Low Impact Green Heavy Transport Solutions (LIGHTS) project. As part of LIGHTS, Greenlots will equip warehouses
  • June 24, 2016
    Elimination of electric vehicle systems
    According to IDTechEx Research reports, Power Electronics for Electric Vehicles 2016-2026, Mild Hybrid 48V Vehicles 2016-2031 and Structural Electronics 2015-2025: Applications, Technologies, Forecasts”, el4ctric vehicles (EVs)have a cost challenge: hybrids have complexity problems meaning reliability and space issues. Extra power electronic units arrive for tasks such as a vehicle-to-grid, vehicle-to-house and inductive charging. Many more will be added in future such as regeneration modules - thermoelect