Skip to main content

Network Rail successfully tests new trains using advanced ‘in-cab’ signalling system

An advanced signalling system that will allow trains to travel every two to three minutes through central London was successfully tested using Govia Thameslink Railway’s new Siemens Class 700 trains for the first time. The Thameslink Programme, part of Network Rail’s Railway Upgrade Plan to provide a bigger, better, more reliable railway for passengers and businesses, achieved another milestone in the early hours of Saturday morning as it successfully ran a Class 700 train through the central London ‘cor
August 5, 2016 Read time: 2 mins
An advanced signalling system that will allow trains to travel every two to three minutes through central London was successfully tested using Govia Thameslink Railway’s new 189 Siemens Class 700 trains for the first time.

The Thameslink Programme, part of Network Rail’s Railway Upgrade Plan to provide a bigger, better, more reliable railway for passengers and businesses, achieved another milestone in the early hours of Saturday morning as it successfully ran a Class 700 train through the central London ‘core’ using European Train Control System (ETCS) Level 2 in-cab signalling.

In-cab signalling is required to allow trains to be driven automatically between St Pancras and Blackfriars stations, under driver supervision, in order to enable up to 24 trains to operate per hour from 2018. This was the first in a series of functional and operational tests planned over the next sixteen months to ensure that trains operate safely and efficiently.

Last year, Network Rail tested its in-cab infrastructure through central London using a Class 313 test train and in collaboration with Govia Thameslink Railway (GTR) and Siemens, tests have been run using a Class 700 train at the ETCS National Integration Facility. This weekend was, however, the first time that a Class 700 train has been tested in central London using the infrastructure it will run on in passenger service from 2018, providing more frequent, more reliable journeys for passengers.

Overnight testing will continue in September, with the first trials of the Automatic Train Operation (ATO) system between St Pancras and Blackfriars. ATO, which enables the train to operate automatically through the ‘core’, was tested successfully at the ETCS National Integration Facility test site on the Hertford loop earlier this year.

The Thameslink Programme is due to take another step forward over the August bank holiday when two thirds of the new concourse is planned to reopen at London Bridge station, resulting in significant service changes for passengers. Passengers should check before they travel.

For more information on companies in this article

Related Content

  • Hamburg’s on-demand alternative to commuting by car
    December 5, 2017
    As Hamburg is confirmed as the host for the 2021 ITS World Congress, David Crawford looks at the city’s moves towards enabling MaaS-type operations. Germany’s second-largest city, Hamburg, is pinning its civic reputation on having its promised all-electric, on-demand, shuttle bus ridesharing service up and running by 2018. Partners in the three-year project are regional metro and bus service provider Hamburger Hochbahn and Volkswagen Group’s Berlinbased mobility innovation subsidiary Moia, which was set
  • TfL launches app to aid social distancing
    August 25, 2020
    App provides accessibility information for disabled users, TfL says. 
  • EBRD connects Kosovo to European Railway network
    September 7, 2015
    The European Bank for Reconstruction and Development (EBRD) is providing a senior loan of US$44.5 million to finance the modernisation of Kosovo’s railway infrastructure, deepening regional integration and strengthening the country’s economic development. The loan to Infrastruktura e Hekurudhave të Kosovës (Infrakos), the national railway infrastructure company, will provide funding to upgrade Kosovo’s only international rail link, Rail Route 10. The 148 kilometre-long line is divided into three section
  • Sony helps Rio get a better view of the Olympics
    June 29, 2016
    With the Olympics approaching, Sony’s Stephane Clauss examines how the latest camera technologies can help cities cope with the huge crowds attending major events. This August will see more than 10,000 athletes head to Rio de Janeiro for the Olympics Games. Alongside them will be their coaching staff, a hoard of logistics teams, thousands of volunteer marshals (London 2012 had 70,000) and millions of spectators. All such major events have nervous jitters on the way to the opening ceremony. This year has see