Skip to main content

Network Rail successfully tests new trains using advanced ‘in-cab’ signalling system

An advanced signalling system that will allow trains to travel every two to three minutes through central London was successfully tested using Govia Thameslink Railway’s new Siemens Class 700 trains for the first time. The Thameslink Programme, part of Network Rail’s Railway Upgrade Plan to provide a bigger, better, more reliable railway for passengers and businesses, achieved another milestone in the early hours of Saturday morning as it successfully ran a Class 700 train through the central London ‘cor
August 5, 2016 Read time: 2 mins
An advanced signalling system that will allow trains to travel every two to three minutes through central London was successfully tested using Govia Thameslink Railway’s new 189 Siemens Class 700 trains for the first time.

The Thameslink Programme, part of Network Rail’s Railway Upgrade Plan to provide a bigger, better, more reliable railway for passengers and businesses, achieved another milestone in the early hours of Saturday morning as it successfully ran a Class 700 train through the central London ‘core’ using European Train Control System (ETCS) Level 2 in-cab signalling.

In-cab signalling is required to allow trains to be driven automatically between St Pancras and Blackfriars stations, under driver supervision, in order to enable up to 24 trains to operate per hour from 2018. This was the first in a series of functional and operational tests planned over the next sixteen months to ensure that trains operate safely and efficiently.

Last year, Network Rail tested its in-cab infrastructure through central London using a Class 313 test train and in collaboration with Govia Thameslink Railway (GTR) and Siemens, tests have been run using a Class 700 train at the ETCS National Integration Facility. This weekend was, however, the first time that a Class 700 train has been tested in central London using the infrastructure it will run on in passenger service from 2018, providing more frequent, more reliable journeys for passengers.

Overnight testing will continue in September, with the first trials of the Automatic Train Operation (ATO) system between St Pancras and Blackfriars. ATO, which enables the train to operate automatically through the ‘core’, was tested successfully at the ETCS National Integration Facility test site on the Hertford loop earlier this year.

The Thameslink Programme is due to take another step forward over the August bank holiday when two thirds of the new concourse is planned to reopen at London Bridge station, resulting in significant service changes for passengers. Passengers should check before they travel.

Related Content

  • November 21, 2012
    Doha implements traffic control system
    Expansion of ITS systems has accelerated in Qatar this year, with rapid deployment of a traffic control system in Doha. Less than 10 years from now an extensive system of ITS technology will be operating in Qatar, informing and directing users of the country’s roads. That can be stated with confidence for a number of reasons: the world’s richest country per capita will host the World Cup in 2022 and is understood to be planning to develop sophisticated systems of ITS for road safety and traffic managemen
  • July 26, 2013
    Spanish rail accident ‘could be the result of over-speed’
    Investigations continue into the cause of the train crash approaching the Spanish city of Santiago de Compostela, but suggestions that the train was travelling too fast appear to be gaining weight. Officials say one of the train's drivers has been put under formal investigation. The president of railway firm Renfe, Julio Gomez Pomar, has said the train in the crash had no technical problems. "The train had passed an inspection that same morning. Those trains are inspected every 7,500km... Its maintenance r
  • February 1, 2012
    Prospects for intercity transport technology
    Magnetic levitation has been dismissed as unproven, too costly, or pie in the sky. It's time to reappraise it. With the unveiling by China (see News section, page 10) of its own, home-grown magnetic levitation train, it would be odd if politicians, policy-makers and the ITS industry did not want to take a closer look at the 'unproven' technology that is magnetic levitation. Fortunately, doing so is easy. The non-profit International Society for Maglev Transportation (The International Maglev Board) has an e
  • February 6, 2012
    Prospects for intercity transport technology
    Magnetic levitation has been dismissed as unproven, too costly, or pie in the sky. It's time to reappraise it