Skip to main content

Network Rail successfully tests new trains using advanced ‘in-cab’ signalling system

An advanced signalling system that will allow trains to travel every two to three minutes through central London was successfully tested using Govia Thameslink Railway’s new Siemens Class 700 trains for the first time. The Thameslink Programme, part of Network Rail’s Railway Upgrade Plan to provide a bigger, better, more reliable railway for passengers and businesses, achieved another milestone in the early hours of Saturday morning as it successfully ran a Class 700 train through the central London ‘cor
August 5, 2016 Read time: 2 mins
An advanced signalling system that will allow trains to travel every two to three minutes through central London was successfully tested using Govia Thameslink Railway’s new 189 Siemens Class 700 trains for the first time.

The Thameslink Programme, part of Network Rail’s Railway Upgrade Plan to provide a bigger, better, more reliable railway for passengers and businesses, achieved another milestone in the early hours of Saturday morning as it successfully ran a Class 700 train through the central London ‘core’ using European Train Control System (ETCS) Level 2 in-cab signalling.

In-cab signalling is required to allow trains to be driven automatically between St Pancras and Blackfriars stations, under driver supervision, in order to enable up to 24 trains to operate per hour from 2018. This was the first in a series of functional and operational tests planned over the next sixteen months to ensure that trains operate safely and efficiently.

Last year, Network Rail tested its in-cab infrastructure through central London using a Class 313 test train and in collaboration with Govia Thameslink Railway (GTR) and Siemens, tests have been run using a Class 700 train at the ETCS National Integration Facility. This weekend was, however, the first time that a Class 700 train has been tested in central London using the infrastructure it will run on in passenger service from 2018, providing more frequent, more reliable journeys for passengers.

Overnight testing will continue in September, with the first trials of the Automatic Train Operation (ATO) system between St Pancras and Blackfriars. ATO, which enables the train to operate automatically through the ‘core’, was tested successfully at the ETCS National Integration Facility test site on the Hertford loop earlier this year.

The Thameslink Programme is due to take another step forward over the August bank holiday when two thirds of the new concourse is planned to reopen at London Bridge station, resulting in significant service changes for passengers. Passengers should check before they travel.

For more information on companies in this article

Related Content

  • Coronavirus: World’s transit system moves into lockdown
    March 20, 2020
    The threat of coronavirus is plunging the world’s transit systems into lockdown as ridership numbers dwindle and limited services become the norm.
  • Network Rail plans on HaCon
    September 22, 2014
    Network Rail, which owns and operates the UK's railway infrastructure, has extended its long-term partnership with HaCon for a further five years and will continue to use their train planning system TPS. The system enables train planners can create and adapt optimal train schedules across the complex railway infrastructure, constantly responding to the ever-increasing demands of passenger and freight needs across the country. Up to 300 train planners can use TPS to plan over 21,000 train services per da
  • Transportation hub the centre of sustainable urban development
    November 21, 2012
    A marriage of transit, technology and culture is taking shape in Minneapolis, with ITS systems vital to hopes for a sustainable development centred on a hub of public transportation. Construction started in July this year on ‘The Interchange’ – a station in the Midwest US city of Minneapolis claimed as the most spectacular expression yet of the fast-spreading North American concept of transit-oriented development (TOD). Due for completion in 2014, the Interchange is designed as a multi-modal public transpor
  • 'Follow signs - not satnav' says National Highways to music fans
    August 24, 2023
    Traffic management helps gig-goers get to see Billie Eilish and The Killers at Leeds Festival