Skip to main content

Network Rail successfully tests new trains using advanced ‘in-cab’ signalling system

An advanced signalling system that will allow trains to travel every two to three minutes through central London was successfully tested using Govia Thameslink Railway’s new Siemens Class 700 trains for the first time. The Thameslink Programme, part of Network Rail’s Railway Upgrade Plan to provide a bigger, better, more reliable railway for passengers and businesses, achieved another milestone in the early hours of Saturday morning as it successfully ran a Class 700 train through the central London ‘cor
August 5, 2016 Read time: 2 mins
An advanced signalling system that will allow trains to travel every two to three minutes through central London was successfully tested using Govia Thameslink Railway’s new 189 Siemens Class 700 trains for the first time.

The Thameslink Programme, part of Network Rail’s Railway Upgrade Plan to provide a bigger, better, more reliable railway for passengers and businesses, achieved another milestone in the early hours of Saturday morning as it successfully ran a Class 700 train through the central London ‘core’ using European Train Control System (ETCS) Level 2 in-cab signalling.

In-cab signalling is required to allow trains to be driven automatically between St Pancras and Blackfriars stations, under driver supervision, in order to enable up to 24 trains to operate per hour from 2018. This was the first in a series of functional and operational tests planned over the next sixteen months to ensure that trains operate safely and efficiently.

Last year, Network Rail tested its in-cab infrastructure through central London using a Class 313 test train and in collaboration with Govia Thameslink Railway (GTR) and Siemens, tests have been run using a Class 700 train at the ETCS National Integration Facility. This weekend was, however, the first time that a Class 700 train has been tested in central London using the infrastructure it will run on in passenger service from 2018, providing more frequent, more reliable journeys for passengers.

Overnight testing will continue in September, with the first trials of the Automatic Train Operation (ATO) system between St Pancras and Blackfriars. ATO, which enables the train to operate automatically through the ‘core’, was tested successfully at the ETCS National Integration Facility test site on the Hertford loop earlier this year.

The Thameslink Programme is due to take another step forward over the August bank holiday when two thirds of the new concourse is planned to reopen at London Bridge station, resulting in significant service changes for passengers. Passengers should check before they travel.

For more information on companies in this article

Related Content

  • Open communication platform to support cooperative infrastructure
    July 23, 2012
    Within the European Commission's CVIS project, work is going on to shrink the open vehicle communication platform to make it more market-ready and to remove barriers to the creation of appropriate applications by those external to the project. Here, ERTICO's Zeljko Jeftic and Paul Kompfner and Q-Free's Knut Evensen discuss progress. Development of the open communication platform which will support the various applications developed by the European Commission's (EC's) Cooperative Vehicle-Infrastructure Syste
  • Growing use of PC-based systems for urban traffic control
    February 1, 2012
    Siemens Mobility's Mark Bodger discusses the growing use of PC-based systems for urban traffic control. Across the ITS sector, there is a common trend of taking traffic and travel management out of the hands of bespoke solutions, realising the use of common, open-source technologies and solutions and enjoying all the attendant economies of scale and ease of use which that implies.
  • Autobahn shows it is on the ball
    March 25, 2022
    Germany has just created a central organisation to oversee the country’s 13,200km of motorways. David Arminas finds out about Autobahn’s role in cooperative ITS - and its part in the Euro 2024 football tournament
  • McCain to synchronise traffic signals in Temecula
    February 1, 2012
    The city of Temecula in California has approved McCain as the sole supplier for its citywide adaptive traffic signal synchronisation system.