Skip to main content

Network Rail successfully tests new trains using advanced ‘in-cab’ signalling system

An advanced signalling system that will allow trains to travel every two to three minutes through central London was successfully tested using Govia Thameslink Railway’s new Siemens Class 700 trains for the first time. The Thameslink Programme, part of Network Rail’s Railway Upgrade Plan to provide a bigger, better, more reliable railway for passengers and businesses, achieved another milestone in the early hours of Saturday morning as it successfully ran a Class 700 train through the central London ‘cor
August 5, 2016 Read time: 2 mins
An advanced signalling system that will allow trains to travel every two to three minutes through central London was successfully tested using Govia Thameslink Railway’s new 189 Siemens Class 700 trains for the first time.

The Thameslink Programme, part of Network Rail’s Railway Upgrade Plan to provide a bigger, better, more reliable railway for passengers and businesses, achieved another milestone in the early hours of Saturday morning as it successfully ran a Class 700 train through the central London ‘core’ using European Train Control System (ETCS) Level 2 in-cab signalling.

In-cab signalling is required to allow trains to be driven automatically between St Pancras and Blackfriars stations, under driver supervision, in order to enable up to 24 trains to operate per hour from 2018. This was the first in a series of functional and operational tests planned over the next sixteen months to ensure that trains operate safely and efficiently.

Last year, Network Rail tested its in-cab infrastructure through central London using a Class 313 test train and in collaboration with Govia Thameslink Railway (GTR) and Siemens, tests have been run using a Class 700 train at the ETCS National Integration Facility. This weekend was, however, the first time that a Class 700 train has been tested in central London using the infrastructure it will run on in passenger service from 2018, providing more frequent, more reliable journeys for passengers.

Overnight testing will continue in September, with the first trials of the Automatic Train Operation (ATO) system between St Pancras and Blackfriars. ATO, which enables the train to operate automatically through the ‘core’, was tested successfully at the ETCS National Integration Facility test site on the Hertford loop earlier this year.

The Thameslink Programme is due to take another step forward over the August bank holiday when two thirds of the new concourse is planned to reopen at London Bridge station, resulting in significant service changes for passengers. Passengers should check before they travel.

For more information on companies in this article

Related Content

  • TEXpress adds reversible managed lanes
    April 19, 2017
    Land availability restrictions and tidal traffic flows have led to the implementation of a novel managed lane configuration in Texas, as Colin Sowman finds out. Dealing with traffic congestion related to the ‘tidal flows’ caused by large numbers of commuters making their way into major business hubs in the morning and returning to the suburbs in the evening, has seen the widespread use of adaptive signal timing and even reversible lanes.
  • London Underground begins search for supplier of 'new Tube for London'
    March 3, 2014
    London Underground (LU) has begun the search for a supplier to build the 'new Tube for London, the next generation of deep-level, energy efficient, walk-through and air-cooled Tube trains. The new trains, capable of full automation, will operate on the Bakerloo, Central, Piccadilly and Waterloo and City line and will enable more frequent and reliable services, boosting capacity and making journeys better and more comfortable for customers. 250 new trains will include air-cooling for the first time on
  • Tyne & Wear signal upgrade aids bus times
    December 3, 2012
    Siemens is to upgrade over 160 traffic signal controllers across the UK’s Tyne & Wear region following the award of Government Better Bus Area (BBA) funding to the Tyne & Wear Integrated Transport Authority. The project aims to improve the reliability of journey times along 19 bus corridors and relieve congestion at nine hotspots where buses are currently regularly delayed. Siemens will upgrade and connect traffic controllers to its Remote Monitoring System (RMS) and provide the Tyne & Wear urban traffic co
  • Connected vehicle data promises advanced weather warning
    August 29, 2012
    Connected vehicle research and development is being aimed at improving driver safety and mobility, but is also promising advanced weather monitoring and warning systems. Sheldon Drobot reports. Over the last few years, the United States’ Federal Highway Administration (FHWA) and Research & Innovative Technology Administration (RITA) have joined forces to promote safety, mobility and the environment through a new connected vehicle initiative. This aims to enable wireless communication between vehicles, infra