Skip to main content

Network Rail electrifies station car parks

ChargePoint Services is to install an eight vehicle electric charging facility at Network Rail’s public car parks at Euston and Victoria railway stations in central London. The installation is part of Network Rail’s on-going sustainability strategy, which aims to make commuting via the rail network the greenest way to travel. ChargePoint Services worked alongside Network Rail to help develop this initiative and install a solution to meet Network Rail’s specific EV charging requirements. The solution inst
July 8, 2013 Read time: 1 min
4825 ChargePoint Services is to install an eight vehicle electric charging facility at 5021 Network Rail’s public car parks at Euston and Victoria railway stations in central London.  The installation is part of Network Rail’s on-going sustainability strategy, which aims to make commuting via the rail network the greenest way to travel.  

ChargePoint Services worked alongside Network Rail to help develop this initiative and install a solution to meet Network Rail’s specific EV charging requirements.  The solution installed includes five dual socket GE DuraStation pedestal AC units at Euston and three at Victoria station car parks, providing 32amp type 2, mode 3, fast charging for electric vehicles.  All units are GPRS networked, and RFID compliant with the Source London and PiP schemes and are monitored and managed via ChargePoint’s back office system, CPMS.

For more information on companies in this article

Related Content

  • L-Charge EV project turns to crowdfunding
    December 15, 2021
    Crowdfunding amount would fund half of the project
  • San Francisco to build 'equitable' public transit
    May 3, 2021
    ConnectSF collaboration seeks projects to ensure sustainable transportation in city
  • Smart Spanish city trials cell-based traffic management
    November 7, 2013
    David Crawford reports on an urban electronic nervous system. The northern Spanish city of Santander – historically a port - is now an emerging technology showcase attracting global attention as a prototype for a medium-sized smart city of the future. In a move to determine the optimal use of available data, it is creating a de-facto experimental laboratory for sensor and mobile phone-based urban traffic management and environmental monitoring innovations.
  • SafeZone schemes increase road safety in Brighton and Hastings
    February 28, 2018
    Two of Siemens’ SafeZone average speed schemes in Brighton and Hastings have received acclaim from Sussex Safer Roads Partnership (SSRP) following the first six months of operation which recorded 98.8% speed compliance. The cameras are intended to help improve road safety and reduce the risk of collisions. SafeZone’s average speed enforcement system was installed along Brighton Seafront on Marine Parade and on the A259 Grosvenor Crescent in Hastings. Both schemes also used infra-red lighting to avoid