Skip to main content

Network Rail electrifies station car parks

ChargePoint Services is to install an eight vehicle electric charging facility at Network Rail’s public car parks at Euston and Victoria railway stations in central London. The installation is part of Network Rail’s on-going sustainability strategy, which aims to make commuting via the rail network the greenest way to travel. ChargePoint Services worked alongside Network Rail to help develop this initiative and install a solution to meet Network Rail’s specific EV charging requirements. The solution inst
July 8, 2013 Read time: 1 min
4825 ChargePoint Services is to install an eight vehicle electric charging facility at 5021 Network Rail’s public car parks at Euston and Victoria railway stations in central London.  The installation is part of Network Rail’s on-going sustainability strategy, which aims to make commuting via the rail network the greenest way to travel.  

ChargePoint Services worked alongside Network Rail to help develop this initiative and install a solution to meet Network Rail’s specific EV charging requirements.  The solution installed includes five dual socket GE DuraStation pedestal AC units at Euston and three at Victoria station car parks, providing 32amp type 2, mode 3, fast charging for electric vehicles.  All units are GPRS networked, and RFID compliant with the Source London and PiP schemes and are monitored and managed via ChargePoint’s back office system, CPMS.

For more information on companies in this article

Related Content

  • Unicard achieves smart ticketing certification
    April 23, 2025
    Itso 2.1.5 includes media tailored for in-wallet digital ticketing for mass transit
  • Russia 2018 World Cup: ITS can win it
    June 5, 2018
    Teams and supporters will cover vast distances in Russia for the 2018 FIFA World Cup. Stephane Clauss from Sony Europe’s Image Sensing Solutions division examines how the latest camera technologies can be deployed to help things run smoothly over the next month or so... For one month, from June 14, Russia is hosting the 2018 FIFA World Cup. This is the largest country in the world and the distances between venues will be larger than at almost any other World Cup - bar the finals in the US and Brazil.
  • Louis Berger awarded Mumbai Metro Line four contract
    April 12, 2018
    The Mumbai Metropolitan Region Development Authority (MMRDA) has awarded Louis Berger the project management and construction management contract to work alongside a consortium for the city’s Metro Line 4. Once completed, the service is expected to reduce travel times between Wadala and Kasarvadavali by up to 75%. Line 4, expected to cost ₹15,549 crore ($1.59bn), will be a 32.3-kilometer long elevated corridor with 32 stations. The route will offer interconnectivity between the eastern expressway, central
  • GE researchers developing at-home refuelling station for NG vehicles
    July 20, 2012
    In what could help fuel widespread adoption of natural gas-powered (NG) vehicles in the US and globally, GE researchers, in partnership with Chart Industries and scientists at the University of Missouri, have been awarded a programme through Advanced Research Projects Agency for Energy (ARPA-E) to develop an affordable at-home refuelling station that would meet ARPA-E’s target of $500 per station and reduce re-fuelling times from 5-8 hours to less than 1 hour. Natural gas prices are at an all-time low and t