Skip to main content

Netherlands to get nationwide network of EV fast-charging stations

By 2015, electric vehicle (EV) drivers in the Netherlands will never be more than 50 kilometres from a fast charging station. Power and automation technology company ABB has been selected by Fastned to supply chargers to more than 200 electric vehicle fast-charging stations in the Netherlands. Each of the more than 200 Fastned stations will be located a maximum of 50 kilometres apart along all Dutch highways. The stations will be equipped with several multi-standards fast chargers, such as the 50 kW Terra
July 8, 2013 Read time: 2 mins
By 2015, electric vehicle (EV) drivers in the Netherlands will never be more than 50 kilometres from a fast charging station.  Power and automation technology company 4540 ABB has been selected by Fastned to supply chargers to more than 200 electric vehicle fast-charging stations in the Netherlands.

Each of the more than 200 Fastned stations will be located a maximum of 50 kilometres apart along all Dutch highways.  The stations will be equipped with several multi-standards fast chargers, such as the 50 kW Terra 52 and Terra 53 models, capable of charging electric vehicles in 15-30 minutes. The first fast chargers are due to be delivered in September 2013, while construction of the Fastned stations, which will have solar canopies, is expected to be completed by 2015.

ABB’s multi-standard design ensures that the network will be capable of serving EVs offered by all major car brands from Europe, Asia and the USA. ABB’s open standards-based cloud connectivity solution allows Fastned to create a user-friendly payment and access service for all drivers.

“Fastned chose ABB for its proven expertise in deploying and managing nationwide EV charging networks,” said ABB’s Ulrich Spiesshofer. ABB provides the chargers and industry-leading software solutions for remote servicing as well as connectivity to subscriber management and payment systems.”

“This countrywide network of locations will provide the basis for the commercially viable development of e-mobility,” said Bart Lubbers, one of Fastned’s founders. “I foresee a race towards faster charging and larger batteries throughout the car industry.”

For more information on companies in this article

Related Content

  • Cooperative infrastructure systems waiting for the go ahead
    February 3, 2012
    Despite much research and technological promise, progress towards cooperative infrastructure system deployment is still slow. Here, Robert Cone and John Miles take a considered look at how and when it might come about. From a systems engineering viewpoint it looks logical and inevitable that vehicles should be communicating between themselves and with the road infrastructure. But seen from a business viewpoint the case is not proven.
  • Vital Technology data comms network deployed at Dublin Port Tunnel
    July 13, 2012
    Vital Technology has supplied a data communications network system to Egis Road & Tunnel Operation Ireland (ERTO) for the Dublin Port Tunnel which opened to traffic in 2007 and is the longest urban tunnel in Europe as well as the largest civil engineering project ever undertaken in Ireland. While core components are proving durable, communication systems became subject to early obsolescence and were causing networking problems and unscheduled closures which prompted the upgrade.
  • Greener transit via Maryland microgrid
    November 7, 2022
    Arup is involved in Montgomery County smart energy project in Maryland, US
  • Research shows smart charging can be key solution to challenge of network demand from EVs
    September 5, 2017
    The UK Electric Nation project is due to announce its initial findings on the first day of the Cenex Low Carbon Vehicle event (LCV2017) this week, which will show that smart charging can provide a key solution to the challenge of the demand from increasing numbers of electric vehicles (EVs) on electricity networks.