Skip to main content

Netherlands to get nationwide network of EV fast-charging stations

By 2015, electric vehicle (EV) drivers in the Netherlands will never be more than 50 kilometres from a fast charging station. Power and automation technology company ABB has been selected by Fastned to supply chargers to more than 200 electric vehicle fast-charging stations in the Netherlands. Each of the more than 200 Fastned stations will be located a maximum of 50 kilometres apart along all Dutch highways. The stations will be equipped with several multi-standards fast chargers, such as the 50 kW Terra
July 8, 2013 Read time: 2 mins
By 2015, electric vehicle (EV) drivers in the Netherlands will never be more than 50 kilometres from a fast charging station.  Power and automation technology company 4540 ABB has been selected by Fastned to supply chargers to more than 200 electric vehicle fast-charging stations in the Netherlands.

Each of the more than 200 Fastned stations will be located a maximum of 50 kilometres apart along all Dutch highways.  The stations will be equipped with several multi-standards fast chargers, such as the 50 kW Terra 52 and Terra 53 models, capable of charging electric vehicles in 15-30 minutes. The first fast chargers are due to be delivered in September 2013, while construction of the Fastned stations, which will have solar canopies, is expected to be completed by 2015.

ABB’s multi-standard design ensures that the network will be capable of serving EVs offered by all major car brands from Europe, Asia and the USA. ABB’s open standards-based cloud connectivity solution allows Fastned to create a user-friendly payment and access service for all drivers.

“Fastned chose ABB for its proven expertise in deploying and managing nationwide EV charging networks,” said ABB’s Ulrich Spiesshofer. ABB provides the chargers and industry-leading software solutions for remote servicing as well as connectivity to subscriber management and payment systems.”

“This countrywide network of locations will provide the basis for the commercially viable development of e-mobility,” said Bart Lubbers, one of Fastned’s founders. “I foresee a race towards faster charging and larger batteries throughout the car industry.”

For more information on companies in this article

Related Content

  • Less travel aggravation to blunt Aggieland fans’ motivation
    June 17, 2016
    Returning travel times to normal within two hours of the end of a major football game was the challenge facing College Station, Adam Lyons explains how this was achieved. College Station, TX, also known as ‘Aggieland’, is located right in the middle of the Dallas/Fort Worth, San Antonio and Houston triangle making the city accessible to over 14 million Texans within less than a four-hour drive. One of the biggest draws to this area is Texas A&M University (TAMU) and the Aggie football games in the fall, mea
  • A carbon free and accident free Europe by 2015?
    February 2, 2012
    By 2050, the Europe Commission aims to make transport in Europe carbon- and accident-free. Between now and then, however, a significant technological development and deployment effort is needed. Here, Neelie Kroes, European Commission Vice-President for the Digital Agenda, talks about what's being done. In many respects, COOPERS, CVIS and SAFESPOT, set up by the European Commission (EC) to explore the potential of cooperative infrastructure systems, are already legacy projects. Between them, the three devel
  • Slow development of Europe's road user charging
    April 24, 2013
    Delegates convened in Brussels for Europe’s 10th annual Road User Charging Conference in March, when both positive and negative developments came to light for advocates of more widespread introduction of RUC. Jon Masters reports. Goings on across Europe in recent months have again demonstrated how very sensitive road user charging (RUC) is politically. At the 10th annual Road User Charging Conference in Brussels at the beginning of March, a Danish delegation was notable for its absence, but Belgian governme
  • Nokia builds comms network for the smart, super-connected highway
    March 6, 2025
    The challenges are clear, but operators are embracing digitalisation and automation as they work to transform the highway landscape