Skip to main content

Netherlands to get nationwide network of EV fast-charging stations

By 2015, electric vehicle (EV) drivers in the Netherlands will never be more than 50 kilometres from a fast charging station. Power and automation technology company ABB has been selected by Fastned to supply chargers to more than 200 electric vehicle fast-charging stations in the Netherlands. Each of the more than 200 Fastned stations will be located a maximum of 50 kilometres apart along all Dutch highways. The stations will be equipped with several multi-standards fast chargers, such as the 50 kW Terra
July 8, 2013 Read time: 2 mins
By 2015, electric vehicle (EV) drivers in the Netherlands will never be more than 50 kilometres from a fast charging station.  Power and automation technology company 4540 ABB has been selected by Fastned to supply chargers to more than 200 electric vehicle fast-charging stations in the Netherlands.

Each of the more than 200 Fastned stations will be located a maximum of 50 kilometres apart along all Dutch highways.  The stations will be equipped with several multi-standards fast chargers, such as the 50 kW Terra 52 and Terra 53 models, capable of charging electric vehicles in 15-30 minutes. The first fast chargers are due to be delivered in September 2013, while construction of the Fastned stations, which will have solar canopies, is expected to be completed by 2015.

ABB’s multi-standard design ensures that the network will be capable of serving EVs offered by all major car brands from Europe, Asia and the USA. ABB’s open standards-based cloud connectivity solution allows Fastned to create a user-friendly payment and access service for all drivers.

“Fastned chose ABB for its proven expertise in deploying and managing nationwide EV charging networks,” said ABB’s Ulrich Spiesshofer. ABB provides the chargers and industry-leading software solutions for remote servicing as well as connectivity to subscriber management and payment systems.”

“This countrywide network of locations will provide the basis for the commercially viable development of e-mobility,” said Bart Lubbers, one of Fastned’s founders. “I foresee a race towards faster charging and larger batteries throughout the car industry.”

For more information on companies in this article

Related Content

  • ITS innovations – a change for the better?
    May 5, 2016
    Josef Czako takes a look at what the future developments may hold for both the transport sector and society. As the dust of the 2015 World Congress in Bordeaux settles, we can begin to see more clearly some of the most important future innovations in ITS are starting to be linked together: mobility as a service (MaaS), mobility pricing and autonomous vehicles. They all are based on global trends, like digitalisation, automation and servitisation.
  • Flagship French motorway inaugurated
    April 16, 2014
    The inauguration of the French Landes A63 motorway marked the culmination of 27 months of major works carried out adjacent to traffic by the economic interest group GIE A63. The road concessionaire, Atlandes, of which Egis is a shareholder, had awarded the construction contract to GIE A63, which then hired Egis for the turnkey integration of fixed and operational equipment and an 80 per cent share of the engineering, procurement and construction management. Atlandes also awarded Egis the subsequent operati
  • Scale of Germany’s electromoblity plans revealed
    May 11, 2012
    In view of Germany's ambitious electromobility target - one million electric cars in use in 2020, compared to 4,500 e-cars nationwide at present - the automobile industry plans to offer more than 15 new electric vehicle models in the coming two years, according to the National Platform E-Mobility's (NPE Nationale Plattform Elektromobilität's) third report. First application fields for electrified cars could be car sharing models and public authority vehicle fleets.
  • NYC tracks vehicles, installs charging points
    May 29, 2013
    New York City is to get additional automatic licence plate readers (ALPR) and more charging points for electric vehicles. NYPD Commissioner Raymond W Kelly announced the project to install automatic licence plate reader (ALPR) cameras in all traffic lanes on all bridges and tunnels that serve as entrances and exits to Manhattan. The NYPD already has complete coverage on the several bridges and tunnels in the city, and additional cameras will be added to cover other locations. The department has also mounted