Skip to main content

Multi-million dollar safety upgrade for New Zealand tunnel

New Zealand transport Minister Simon Bridges has announced work is set to begin on a multi-million dollar fire deluge system that will improve safety and reduce the risk of lengthy closures at Lyttelton Tunnel south of Christchurch. The US$19.9 million (NZ$28.7 million) project is the largest project undertaken at the tunnel since it opened in 1964. The contract has been awarded to McConnell Dowell, with work set to start in the coming weeks. A fire sprinkler system is the most effective means of mana
May 18, 2017 Read time: 1 min
New Zealand transport Minister Simon Bridges has announced work is set to begin on a multi-million dollar fire deluge system that will improve safety and reduce the risk of lengthy closures at Lyttelton Tunnel south of Christchurch.


The US$19.9 million (NZ$28.7 million) project is the largest project undertaken at the tunnel since it opened in 1964. The contract has been awarded to McConnell Dowell, with work set to start in the coming weeks.

A fire sprinkler system is the most effective means of managing fire risk in the tunnel and is designed to control and contain a fire until fire services reach the scene. The project involves the construction of two reservoirs, two pump stations, and the installation of 9km of pipe work and 2,400 fire sprinkler nozzles throughout the tunnel.

The project is expected to be complete by December 2018.

Related Content

  • August 9, 2017
    New Zealand offers new benefits for EV owners
    Operators of electric vehicles (EVs) in New Zealand are set to benefit from rule changes which will see heavy electric vehicles being exempt from road user charges and potentially allow drivers of electric vehicles to use bus and high occupancy vehicle lanes. From 1 September 2017 heavy EVs will be exempt from road user charges, which otherwise apply to vehicles that do not pay for petrol at the pump, until they make up two per cent of New Zealand’s heavy vehicle fleet. Changes have also been made to Land
  • May 26, 2016
    Viaduct deck renewal creates detour dilemma for MassDOT
    As the deck renewal of the I-91 viaduct in Springfield gets underway, David Crawford looks at the preparation and planning to ease the resulting traffic congestion. Accommodating the deck renewal of a 4km-long/four-lanes in each direction viaduct in the heart of Springfield (Massachusetts’ third largest city), has involved the state’s Department of Transportation (MassDOT) in a massive exercise in transport research and ITS-based area-wide preplanning and traffic management. Supporting a workzone of well ab
  • September 15, 2014
    Moxa provides clear vision for Caldecott Tunnel’s Fourth Bore
    Caldecott Tunnel’s new Fourth Bore is utilising a bespoke high-capacity monitoring and communications network from Moxa. The Caldecott Tunnel connects Contra Costa and Alameda counties in Northern California and traditionally it has suffered severe congestion - especially during peak hours. Opened in 1937 as a twin-bore arrangement, by 1964 the increase in traffic volumes led to a third bore being added. Shortly after the third bore was opened a tidal flow was introduced with the centre bore alternating in
  • May 2, 2024
    Highway 99 revisited
    The effects of Covid are still being felt. David Arminas considers how the pandemic has affected toll revenue on Seattle’s newish SR99 tunnel – and looks at the traffic management and emergency plans in place for drivers