Skip to main content

Multi-million dollar safety upgrade for New Zealand tunnel

New Zealand transport Minister Simon Bridges has announced work is set to begin on a multi-million dollar fire deluge system that will improve safety and reduce the risk of lengthy closures at Lyttelton Tunnel south of Christchurch. The US$19.9 million (NZ$28.7 million) project is the largest project undertaken at the tunnel since it opened in 1964. The contract has been awarded to McConnell Dowell, with work set to start in the coming weeks. A fire sprinkler system is the most effective means of mana
May 18, 2017 Read time: 1 min
New Zealand transport Minister Simon Bridges has announced work is set to begin on a multi-million dollar fire deluge system that will improve safety and reduce the risk of lengthy closures at Lyttelton Tunnel south of Christchurch.


The US$19.9 million (NZ$28.7 million) project is the largest project undertaken at the tunnel since it opened in 1964. The contract has been awarded to McConnell Dowell, with work set to start in the coming weeks.

A fire sprinkler system is the most effective means of managing fire risk in the tunnel and is designed to control and contain a fire until fire services reach the scene. The project involves the construction of two reservoirs, two pump stations, and the installation of 9km of pipe work and 2,400 fire sprinkler nozzles throughout the tunnel.

The project is expected to be complete by December 2018.

Related Content

  • July 3, 2017
    Indra technology manages the longest tunnel in south-east Asia
    Indra has installed its smart technology in the control centre of the Chenani road tunnel and has carried out the design, development, implementation and launch of the tunnel's management system, based on its proprietary Horus solution.
  • April 28, 2014
    Sanef wins Mersey Gateway Bridge Free Flow toll system
    Sanef Group has announced the financial close of the Mersey Gateway project in the UK, after Halton Borough Council signed agreements with the Merseylink consortium for the construction and the maintenance of the new bridge and its associated toll system, as well as for the toll operation and demand management.
  • December 19, 2013
    Maine toll road evaluates AET
    A new ten year plan released by the Maine Turnpike Authority defers decisions on work to upgrade its three largest toll plazas pending completion of a next generation toll collection study that will consider the costs and benefits of going all-electronic, versus open road electronic tolling (ORT) and cash and a timetable. Objections from local residents and the failure of the Turnpike to consider the alternative of all-electronic tolling (AET) led to the delay of a previous ten year plan in 2009 that set
  • December 2, 2015
    TransCore to upgrade toll collection on four bridges between US-Mexico
    The City of Laredo has selected TransCore to provide a comprehensive upgrade to the toll collection system on its four international bridges between the US and Mexico. Each year, more than 6.7 million vehicles and three million pedestrians cross the Gateway to the Americas, the Juarez-Lincoln International, the Colombia Solidarity, and the World Trade bridges. The three-year project, which will be completed in 2018, upgrades both the electronic and cash payment toll collection systems.