Skip to main content

Multi-million dollar safety upgrade for New Zealand tunnel

New Zealand transport Minister Simon Bridges has announced work is set to begin on a multi-million dollar fire deluge system that will improve safety and reduce the risk of lengthy closures at Lyttelton Tunnel south of Christchurch. The US$19.9 million (NZ$28.7 million) project is the largest project undertaken at the tunnel since it opened in 1964. The contract has been awarded to McConnell Dowell, with work set to start in the coming weeks. A fire sprinkler system is the most effective means of mana
May 18, 2017 Read time: 1 min
New Zealand transport Minister Simon Bridges has announced work is set to begin on a multi-million dollar fire deluge system that will improve safety and reduce the risk of lengthy closures at Lyttelton Tunnel south of Christchurch.


The US$19.9 million (NZ$28.7 million) project is the largest project undertaken at the tunnel since it opened in 1964. The contract has been awarded to McConnell Dowell, with work set to start in the coming weeks.

A fire sprinkler system is the most effective means of managing fire risk in the tunnel and is designed to control and contain a fire until fire services reach the scene. The project involves the construction of two reservoirs, two pump stations, and the installation of 9km of pipe work and 2,400 fire sprinkler nozzles throughout the tunnel.

The project is expected to be complete by December 2018.

Related Content

  • October 29, 2014
    Auckland considers road user charging to plug funding shortfall
    Auckland, New Zealand, faces a US$9.5 billion transport funding gap to build the fully-integrated transport network set out in the 30-year Auckland Plan that includes new roads, rail, ferries, busways, cycle-ways and supporting infrastructure needed to cope with a population set to hit 2.5 million in the next three decades. If Auckland opts to pay for the fully-integrated Auckland Plan, Auckland Council officials claim the transport network congestion is expected to improve by 20 per cent over the next 1
  • June 19, 2012
    First phase of Houston reversible HOV to HOT lanes completed
    Houston’s Metropolitan Transit Authority of Harris County (Metro) working with prime contractor TransCore has commissioned the first of five reversible high occupancy toll (HOT) lane corridors. One of the most substantial undertakings of its kind to date in the United States, Metro’s conversion of high occupancy vehicle (HOV) lanes to HOT lanes will increase utilization of the HOV system and subsequently relieve congestion in the general purpose freeway lanes. When completed, the programme will span 135kms
  • November 2, 2015
    FCC consortium to build Colombia tunnel project
    A consortium led by Spanish company FCC has been awarded a contract for the Toyo tunnel project, including design, construction, operation and maintenance of the tunnel in the Urabá Port, around 80 kilometres from Medellín, Colombia. The US$432 million project, which is expected to take ten years to complete, is located between the municipalities of Giraldo and Cañasgordas, around 500 kilometres north-west of Bogotá. It includes the building of a completely new road section, 41 kilometres long with one
  • December 17, 2014
    Communications redundancy increases VMS reliability
    Hybrid communications to variable message signs increase resilience to natural disasters and enable deployment in remote areas, as Alan Allegretto explains. Variable Message Signs (VMSs) are a common sight and a well-proven means to improve public safety on our roads and highways. ITS professionals rank the VMS as second only to interoperable radios as the most important technology to improve effectiveness during emergency incidents and evacuations. Ironically, however, current systems suffer from one criti