Skip to main content

Multi-million dollar safety upgrade for New Zealand tunnel

New Zealand transport Minister Simon Bridges has announced work is set to begin on a multi-million dollar fire deluge system that will improve safety and reduce the risk of lengthy closures at Lyttelton Tunnel south of Christchurch. The US$19.9 million (NZ$28.7 million) project is the largest project undertaken at the tunnel since it opened in 1964. The contract has been awarded to McConnell Dowell, with work set to start in the coming weeks. A fire sprinkler system is the most effective means of mana
May 18, 2017 Read time: 1 min
New Zealand transport Minister Simon Bridges has announced work is set to begin on a multi-million dollar fire deluge system that will improve safety and reduce the risk of lengthy closures at Lyttelton Tunnel south of Christchurch.


The US$19.9 million (NZ$28.7 million) project is the largest project undertaken at the tunnel since it opened in 1964. The contract has been awarded to McConnell Dowell, with work set to start in the coming weeks.

A fire sprinkler system is the most effective means of managing fire risk in the tunnel and is designed to control and contain a fire until fire services reach the scene. The project involves the construction of two reservoirs, two pump stations, and the installation of 9km of pipe work and 2,400 fire sprinkler nozzles throughout the tunnel.

The project is expected to be complete by December 2018.

Related Content

  • Connected vehicle trials get big backing from USDOT
    March 14, 2016
    Connected vehicle technology will emerge as a sustainable reality at three sites in the US over the next four years. Jon Masters reports. Advocates of connected vehicle (CV) technology have received a welcome boost from news that the US government has committed a further $4 billion towards automated vehicle research and CV technology. This comes hot on the heels of the US Department of Transportation’s $42 million CV pilot pledge in October last year.
  • Texas DOT reselects Atkins toll-plaza contract
    February 28, 2014
    The Texas Department of Transportation (TxDOT) has reselected Atkins as its state-wide prime consultant for toll-plaza planning, development, and implementation. Under the terms of the five-year, US$10 million contract, Atkins will provide planning, development, infrastructure design and coordination, and construction oversight services, as well as system installation, integration, and testing services for TxDOT toll and managed-lane facilities throughout Texas. TxDOT currently operates more than 493 lan
  • Destiny Thomas on transit's racist legacy
    September 25, 2020
    The killing of George Floyd by US police sparked international protests and put Black Lives Matter into the spotlight. Dr Destiny Thomas, founder and CEO of Thrivance Group, talks to Adam Hill about the legacy of racism in transit, Covid-19, slow streets – and what comes next
  • Intelligent powertrains could make cost cuts
    April 30, 2020
    Intelligent vehicle powertrains could be a way of making substantial cuts in operating costs and emissions. David Crawford looks at some far-reaching initiatives in Europe and North America