Skip to main content

Mott MacDonald providing detailed design for Dominica road rehabilitation project

Mott MacDonald is providing the detailed design for the Loubiere to Bagatelle road rehabilitation project on behalf of the Government of the Commonwealth of Dominica’s Ministry of Public Works and Ports. A grant from the UK’s Department for International Development has been provided to Dominica through the Caribbean Development Bank, following significant damage caused along the road alignment as a result of Tropical Storm Erika in 2015. The project, set over approximately 20km, will see the construction
August 14, 2017 Read time: 2 mins
1869 Mott MacDonald is providing the detailed design for the Loubiere to Bagatelle road rehabilitation project on behalf of the Government of the Commonwealth of Dominica’s Ministry of Public Works and Ports. A grant from the UK’s Department for International Development has been provided to Dominica through the Caribbean Development Bank, following significant damage caused along the road alignment as a result of Tropical Storm Erika in 2015.

The project, set over approximately 20km, will see the construction of nine new bridge structures, the rehabilitation of the road in landslide areas, road safety improvements and upgrades to existing road drainage infrastructure. The scheme will also include assessments and design of foreshore protection, including slope protection measures along the Dubuque Cliffs.

Mott MacDonald will assess the condition of existing infrastructure such as bridges, pavements, drainage and earthworks, as well as provide the detailed design for all necessary civil and structural engineering works as part of the road rehabilitation. The consultancy will also undertake environmental and social impact assessments and prepare extreme weather, environmental and social management plans, as well as contract bidding documentation. The project is due to be completed in 2019.

For more information on companies in this article

Related Content

  • Erskine Bridge goes Bluetooth
    May 12, 2014
    The Erskine Bridge vehicle safety barrier replacement team introduced what is said to be a UK first in temporary traffic management on major trunk roads projects with the use of Bluetooth technology to monitor journey times and keep drivers updated on potential delays. Working on behalf of Transport Scotland, with Leeds-based Sky High Technology, contractor Highway Barrier Solutions and the Scotland TranServ project team introduced the origin-destination vehicle movement system to establish how long it w
  • Kapsch wins Texas tolling projects
    July 31, 2012
    Kapsch TrafficCom IVHS, a subsidiary of Kapsch TrafficCom, has been selected to design, build, and integrate the managed lane system (MLS) for both the North Tarrant Express (NTE) and LBJ Express projects in Dallas and Tarrant Counties in North Texas.
  • Minimum retroreflectivity standards for US
    September 13, 2022
    FHWA changes requirements for minimum levels of retroreflectivity for road markings
  • World Congress opens to news of Austrian telematics developments
    October 22, 2012
    Austria’s Minister for Transport, Innovation and Technology has announced the start of a major test programme to evaluate telematics devices. Speaking at a press conference to launch the World Congress, Doris Bures said that from next week, 3,000 Austrian motorists would participate in a scheme to deliver in-vehicle road information. Geographcally-targeted information on road conditions, weather and traffic would be transmitted to drivers. “If you’re in a car driving on a motorway in eastern Austria,