Skip to main content

Mott MacDonald providing detailed design for Dominica road rehabilitation project

Mott MacDonald is providing the detailed design for the Loubiere to Bagatelle road rehabilitation project on behalf of the Government of the Commonwealth of Dominica’s Ministry of Public Works and Ports. A grant from the UK’s Department for International Development has been provided to Dominica through the Caribbean Development Bank, following significant damage caused along the road alignment as a result of Tropical Storm Erika in 2015. The project, set over approximately 20km, will see the construction
August 14, 2017 Read time: 2 mins
1869 Mott MacDonald is providing the detailed design for the Loubiere to Bagatelle road rehabilitation project on behalf of the Government of the Commonwealth of Dominica’s Ministry of Public Works and Ports. A grant from the UK’s Department for International Development has been provided to Dominica through the Caribbean Development Bank, following significant damage caused along the road alignment as a result of Tropical Storm Erika in 2015.

The project, set over approximately 20km, will see the construction of nine new bridge structures, the rehabilitation of the road in landslide areas, road safety improvements and upgrades to existing road drainage infrastructure. The scheme will also include assessments and design of foreshore protection, including slope protection measures along the Dubuque Cliffs.

Mott MacDonald will assess the condition of existing infrastructure such as bridges, pavements, drainage and earthworks, as well as provide the detailed design for all necessary civil and structural engineering works as part of the road rehabilitation. The consultancy will also undertake environmental and social impact assessments and prepare extreme weather, environmental and social management plans, as well as contract bidding documentation. The project is due to be completed in 2019.

For more information on companies in this article

Related Content

  • UK plans to penalise rush hour road works
    April 18, 2012
    Innovative measures to cut the number of rush hour road works have been announced by UK Transport Secretary Philip Hammond. Under ‘lane rental’ schemes, councils would be able to charge utility companies to dig up the busiest roads during peak times when road works cause the most disruption. Companies would be able to avoid the charges by carrying out works during quieter periods or, if appropriate, at night.
  • EIB supports purchase of modern trams for Krakow and Silesia
    July 10, 2015
    The European Investment Bank (EIB) has provided two loans totalling over US$85 million for the purchase of modern energy-efficient low-floor trams for Krakow and Upper Silesia Agglomeration in Poland. The EIB will also finance the modernisation of the existing tram stock and infrastructure in Silesia.
  • ITS from Indra helps Colombia tunnels
    October 31, 2022
    Tolling and communications are also major part of new Latin American infrastructure project
  • Triplesign shines with low-power solution
    July 15, 2024
    Product is particularly suited to addressing growing issue of flooded road sections