Skip to main content

Motorists want roads repaired before smart motorways, says survey

According to research by Bury-based online car supermarket JamJar Direct, which indicates that 47 per cent of Greater Manchester motorists claim to have been affected by the construction works, communications around the M60 smart motorway improvements are sorely lacking. Almost two thirds of Greater Manchester motorists (62 per cent) are aware that the M60 is being turned into a smart motorway, but over 40 per cent, equivalent to 81,000 vehicles per day using affected stretch of M60 between junctions 8 a
December 5, 2014 Read time: 3 mins
According to research by Bury-based online car supermarket JamJar Direct, which indicates that 47 per cent of Greater Manchester motorists claim to have been affected by the construction works, communications around the M60 smart motorway improvements are sorely lacking.

Almost two thirds of Greater Manchester motorists (62 per cent) are aware that the M60 is being turned into a smart motorway, but over 40 per cent, equivalent to 81,000 vehicles per day using affected stretch of M60 between junctions 8 and 20, have no clue about the reasons behind or benefits from the work.

Despite what the 503 Highways Agency refers to as a “robust communication strategy” that includes over 22,000 leaflets, the majority of motorists surveyed by JamJar Direct couldn’t correctly describe what the smart motorway or the benefits.

11.5 per cent of those surveyed believed the mandatory 50 mph limit currently in place around the works was permanent, 5.7 per cent answered that a smart motorway incorporated the hard shoulder at all times, while 23.3 per cent admitted they didn’t know how a smart motorway worked or understood that it was designed to reduce congestion during peak times. 59.5 per cent accurately identified the correct description.

The vast majority of those surveyed (93 per cent) didn’t think the US$313 million spent on improving the motorway was a reasonable price to pay. Five per cent thought it was a reasonable price, while two per cent said US$627 million would be a reasonable cost to reduce congestion on the affected stretch of motorway.

When asked to suggest alternate uses for the smart motorway budget, the most popular suggestion was to fix road surfaces, with 66 per cent of suggestions making reference to pot holes and damaged road surfaces, of which there are an estimated 1,880 in Manchester.

A spokesperson for the Highways Agency said: “The M60 between junction 8 and M62 junction 20 is already one of the most congested routes in the country with nearly 180,000 vehicles using this section of our network every day. It is because the route is so heavily congested, with unreliable journey times, that we are upgrading this important section of our motorway network to a smart motorway.

“We have a robust communication strategy in place to let people know about the scheme and how it will operate once completed. We have held public information exhibitions, distributed over 22,000 leaflets to local residents, shared information with stakeholders, local councillors and local authorities, provided information through our website and social media.   

“By alleviating congestion, we make journeys more reliable which creates economic benefits. Our scheme economic assessment has concluded that for every £1 we invest in the scheme we get £3 in economic benefits in return.”

A spokesperson for JamJar Direct said: “Being held up is always frustrating, but some of the frustration for many motorists could be mitigated if they better understood the benefits of the work. The Highways Agency has a duty to ensure road users understand the benefits of the work and at present, it seems that many of the region’s road users aren’t sure what is going on.”

For more information on companies in this article

Related Content

  • Changing driving conditions need ongoing driver training
    January 23, 2012
    Trevor Ellis, chairman of the ITS UK Enforcement Interest Group, considers the role of ongoing driver training in increasing compliance. It is over 30 years since I passed my driving test. The world was quite a different place then, in that there were only half the vehicles there are now on the UK's roads, mobile phones did not really exist and (in the UK at least) the vast majority of us drove cars which by today's standards exhibited dreadful dynamic stability and were woefully underpowered.
  • US braces itself for congestion pain
    February 6, 2020
    Mary Scott Nabers, author of Inside the Infrastructure Revolution: A Roadmap for Building America, looks at how different US states are embracing the need for public transport investment
  • UK driver information improvements near completion
    March 27, 2015
    A major investment in technology to help tackle congestion and give better information to drivers across parts of the UK’s north west will be completed by the Highways Agency by the end of the month. Improvements worth more than US$8.5 million, with extended CCTV coverage of the region’s motorways and new electronic variable message signs (VMS), are being delivered by the Highways Agency as part of the Government’ US$470 million pinch point programme. Work on installing new electronic signs and CCTV c
  • Lighting upgrade completed on UK motorway
    May 18, 2017
    UK civil and electrical engineering firm, McCann, has completed the lighting upgrades on a 19km stretch of the M62 motorway between J22-25, replacing 1,224 existing high pressure sodium lanterns with new Ampera Maxi LED lighting units. The project, coordinated by Highways England’s term contractor A-one+, also included the installation of a new central management system, with remote manipulation of operational burn hours, control over the timing of dimmed lighting when there is minimal traffic and fault mon