Skip to main content

Motorists want roads repaired before smart motorways, says survey

According to research by Bury-based online car supermarket JamJar Direct, which indicates that 47 per cent of Greater Manchester motorists claim to have been affected by the construction works, communications around the M60 smart motorway improvements are sorely lacking. Almost two thirds of Greater Manchester motorists (62 per cent) are aware that the M60 is being turned into a smart motorway, but over 40 per cent, equivalent to 81,000 vehicles per day using affected stretch of M60 between junctions 8 a
December 5, 2014 Read time: 3 mins
According to research by Bury-based online car supermarket JamJar Direct, which indicates that 47 per cent of Greater Manchester motorists claim to have been affected by the construction works, communications around the M60 smart motorway improvements are sorely lacking.

Almost two thirds of Greater Manchester motorists (62 per cent) are aware that the M60 is being turned into a smart motorway, but over 40 per cent, equivalent to 81,000 vehicles per day using affected stretch of M60 between junctions 8 and 20, have no clue about the reasons behind or benefits from the work.

Despite what the 503 Highways Agency refers to as a “robust communication strategy” that includes over 22,000 leaflets, the majority of motorists surveyed by JamJar Direct couldn’t correctly describe what the smart motorway or the benefits.

11.5 per cent of those surveyed believed the mandatory 50 mph limit currently in place around the works was permanent, 5.7 per cent answered that a smart motorway incorporated the hard shoulder at all times, while 23.3 per cent admitted they didn’t know how a smart motorway worked or understood that it was designed to reduce congestion during peak times. 59.5 per cent accurately identified the correct description.

The vast majority of those surveyed (93 per cent) didn’t think the US$313 million spent on improving the motorway was a reasonable price to pay. Five per cent thought it was a reasonable price, while two per cent said US$627 million would be a reasonable cost to reduce congestion on the affected stretch of motorway.

When asked to suggest alternate uses for the smart motorway budget, the most popular suggestion was to fix road surfaces, with 66 per cent of suggestions making reference to pot holes and damaged road surfaces, of which there are an estimated 1,880 in Manchester.

A spokesperson for the Highways Agency said: “The M60 between junction 8 and M62 junction 20 is already one of the most congested routes in the country with nearly 180,000 vehicles using this section of our network every day. It is because the route is so heavily congested, with unreliable journey times, that we are upgrading this important section of our motorway network to a smart motorway.

“We have a robust communication strategy in place to let people know about the scheme and how it will operate once completed. We have held public information exhibitions, distributed over 22,000 leaflets to local residents, shared information with stakeholders, local councillors and local authorities, provided information through our website and social media.   

“By alleviating congestion, we make journeys more reliable which creates economic benefits. Our scheme economic assessment has concluded that for every £1 we invest in the scheme we get £3 in economic benefits in return.”

A spokesperson for JamJar Direct said: “Being held up is always frustrating, but some of the frustration for many motorists could be mitigated if they better understood the benefits of the work. The Highways Agency has a duty to ensure road users understand the benefits of the work and at present, it seems that many of the region’s road users aren’t sure what is going on.”

Related Content

  • M6 should be priority for Government investment, drivers tell FTA
    December 20, 2016
    The Freight Transport Association (FTA) has been looking at stretches of the UK’s strategic road network that would most benefit from Government investment following the Chancellor’s commitment in his Autumn Statement to fund improvements to congestion hot spots. Philip Hammond said the Government would spend IS$1.6 billion (£1.3 billion) on improving England’s roads, including US$222 million (£220 million) on tackling congestion at pinch points and US$33 million (£27 million) on an expressway connecting Ox
  • The importance of going with the flow
    April 6, 2018
    Ensuring worker safety and up-to-date driver information is crucial to ensure that roadworks are not a source of danger and delay. Andrew Williams looks at a scheme on the A14 in Cambridgeshire, UK. In recent years, portable workzone ITS solutions have emerged as important tools in the management of major roadworks and system upgrade projects - and are viewed as an increasingly vital means of ensuring any ongoing traffic flow disruption is kept to a minimum. The technology forms a central component of an
  • High-mileage drivers more dismissive value of speed cameras, says survey
    July 27, 2015
    High-mileage drivers are more likely than any other type of road user to think speed cameras have ‘little or no influence’ in reducing the numbers of road casualties in the UK, according to a white paper issued by the Institute of Advanced Motorists’ (IAM) Drive and Survive division. The paper, Speed Cameras – The Views of High Mileage Drivers, also found 28 per cent of high-mileage drivers have a negative view of speed cameras – 10 per cent more than other drivers. It also found that more than half o
  • UK to tackle US$1.6 billion cost of motorway closures
    April 25, 2012
    A UK government strategy to tackle congestion caused by motorway closures and drive down the £1 billion (US$1.6 billion) annual cost to the economy has been unveiled by Roads Minister Mike Penning, who also announced the launch of a £3 million ($4.87 million) fund for police forces to purchase laser scanning technology to speed up of the investigation process and incident clear up times.