Skip to main content

More Siemens trains for London

In a deal worth US$282 million, Siemens is to replace the Govia Thameslink Railway (GTR) suburban train fleet on the Great Northern route. The 25 climate-controlled six-carriage units (150 vehicles) will be built at the Siemens plant Krefeld, Germany and will enter service by the end of 2018. The trains will run between Moorgate in the City of London and Welwyn and Hertford, Stevenage and Letchworth. They will be made by Siemens as a variant of the Class 700 trains, based on the Desiro City platform, whi
February 23, 2016 Read time: 1 min
In a deal worth US$282 million, 189 Siemens is to replace the Govia Thameslink Railway (GTR) suburban train fleet on the Great Northern route. The 25 climate-controlled six-carriage units (150 vehicles) will be built at the Siemens plant Krefeld, Germany and will enter service by the end of 2018.

The trains will run between Moorgate in the City of London and Welwyn and Hertford, Stevenage and Letchworth. They will be made by Siemens as a variant of the Class 700 trains, based on the Desiro City platform, which is being built for GTR's new Thameslink service.

These trains replace Class 313 trains built in 1976/77, which are the oldest type of electric trains in operation in mainland Britain.

Related Content

  • December 16, 2016
    Video analytics enhances urban rail safety
    David Crawford explores some promising innovations for North American commuters. North America is experiencing a surge in commuter rail and metro development. The US now has 75 light rail and metro networks in operation; and California, in particular, is actively exploring ways of developing the state’s existing passenger rail operations into a fully integrated system.
  • February 1, 2012
    Prospects for intercity transport technology
    Magnetic levitation has been dismissed as unproven, too costly, or pie in the sky. It's time to reappraise it. With the unveiling by China (see News section, page 10) of its own, home-grown magnetic levitation train, it would be odd if politicians, policy-makers and the ITS industry did not want to take a closer look at the 'unproven' technology that is magnetic levitation. Fortunately, doing so is easy. The non-profit International Society for Maglev Transportation (The International Maglev Board) has an e
  • February 6, 2012
    Prospects for intercity transport technology
    Magnetic levitation has been dismissed as unproven, too costly, or pie in the sky. It's time to reappraise it
  • November 25, 2015
    UK's first tram train en route to Sheffield
    THE UK’S first tram train vehicle has started its journey to Sheffield from Spain. The fully-constructed, 37m long tram train will make a two week voyage over land and sea from Valencia before arriving in South Yorkshire on 1 December. Passengers in the county will be the first in the UK to benefit from the innovative new tram train, a tram-type vehicle that has the signalling, power supply, control and communication technology to run on both street tram lines and the rail network.