Skip to main content

More Siemens trains for London

In a deal worth US$282 million, Siemens is to replace the Govia Thameslink Railway (GTR) suburban train fleet on the Great Northern route. The 25 climate-controlled six-carriage units (150 vehicles) will be built at the Siemens plant Krefeld, Germany and will enter service by the end of 2018. The trains will run between Moorgate in the City of London and Welwyn and Hertford, Stevenage and Letchworth. They will be made by Siemens as a variant of the Class 700 trains, based on the Desiro City platform, whi
February 23, 2016 Read time: 1 min
In a deal worth US$282 million, 189 Siemens is to replace the Govia Thameslink Railway (GTR) suburban train fleet on the Great Northern route. The 25 climate-controlled six-carriage units (150 vehicles) will be built at the Siemens plant Krefeld, Germany and will enter service by the end of 2018.

The trains will run between Moorgate in the City of London and Welwyn and Hertford, Stevenage and Letchworth. They will be made by Siemens as a variant of the Class 700 trains, based on the Desiro City platform, which is being built for GTR's new Thameslink service.

These trains replace Class 313 trains built in 1976/77, which are the oldest type of electric trains in operation in mainland Britain.

For more information on companies in this article

Related Content

  • Europe’s heavy trucks ‘no more fuel-efficient than ten years ago’
    December 4, 2015
    A study by the International Council on Clean Transportation (ICCT) claims that trucks in the European Union are no more fuel-efficient than they were a decade ago. The study, which analyses data from the European commercial trucking market, looking at key member states, manufacturers and fuel consumption trend, found that heavy-duty vehicles represent only four per cent of the on-road fleet in the European Union, but are responsible for 30 per cent of on-road CO2 emissions. In contrast, the study cla
  • Wireless technology aids workzone communications
    June 7, 2012
    Need for a temporary communication fix during a construction project has led to rapid deployment of a permanent but simplistic wireless broadband network in Chandler, Arizona When a major construction project was expected to disrupt highway communications in the city of Chandler, Arizona, the city’s engineers went looking for a simple solution. They needed a way of maintaining data connections with three consecutive intersections along Arizona Avenue in Chandler while construction necessitated the severin
  • Europe-bound drivers fail numbers test
    August 3, 2015
    With almost six million of the UK’s motorists expected to head to Europe before the end of 2015, new survey by RAC European Breakdown exposes Britons' ignorance of what to do if in distress on overseas roads. It found that most drivers can't name the European Union (EU)-wide three-digit number to call in emergencies. Only 38% know the correct answer is 112. Worryingly, 10 per cent think the normal UK 111 non-emergency NHS line extends its reach throughout the EU. A further 6 per cent confuse their contin
  • NEC ready for roll-out of widespread C2X deployments
    October 24, 2012
    Developments are hotting up in the world of C2X communication between vehicles and infrastructure, and NEC is ready with technology developed for when these and other new systems of ITS are deployed. This is the company that built and operates Japan’s Nexco Central national traffic control centre and installed the cameras and sensors covering 2000km of Japanese roads (a system that delegates can observe at next year’s ITS World Congress in Tokyo). The latest components NEC has ready for deployment include c