Skip to main content

More Siemens trains for London

In a deal worth US$282 million, Siemens is to replace the Govia Thameslink Railway (GTR) suburban train fleet on the Great Northern route. The 25 climate-controlled six-carriage units (150 vehicles) will be built at the Siemens plant Krefeld, Germany and will enter service by the end of 2018. The trains will run between Moorgate in the City of London and Welwyn and Hertford, Stevenage and Letchworth. They will be made by Siemens as a variant of the Class 700 trains, based on the Desiro City platform, whi
February 23, 2016 Read time: 1 min
In a deal worth US$282 million, 189 Siemens is to replace the Govia Thameslink Railway (GTR) suburban train fleet on the Great Northern route. The 25 climate-controlled six-carriage units (150 vehicles) will be built at the Siemens plant Krefeld, Germany and will enter service by the end of 2018.

The trains will run between Moorgate in the City of London and Welwyn and Hertford, Stevenage and Letchworth. They will be made by Siemens as a variant of the Class 700 trains, based on the Desiro City platform, which is being built for GTR's new Thameslink service.

These trains replace Class 313 trains built in 1976/77, which are the oldest type of electric trains in operation in mainland Britain.

For more information on companies in this article

Related Content

  • Smoothing the path to reducing traffic pollution
    October 22, 2014
    David Crawford reviews a new approach to traffic smoothing. A key objective for the Californian city of Bakersfield’s upgraded traffic operations centre (TOC), which opened in June 2014, is to help improve living conditions in a region with one of the worst air quality problems in the US. The TOC is speeding up the smoothing of traffic flows by delivering faster and better-informed traffic signal retiming and synchronisation.
  • Thales signs deals with China, Korea, Turkey
    June 15, 2020
    French firm closes three signal control contracts for urban rail systems
  • Close shave for Brazilian project
    June 12, 2015
    Signing the order to equip a new control room just 45 days before the city hosts a major sporting event is challenging - but some deadlines just cannot be moved. There is nothing like a deadline to concentrate minds and effort as Mitsubishi and the Brazilian city of Belo Horizonte discovered in the run-up to the 2014 World Cup. Although municipal authorities had been considering a new command centre for years, it was the hosting of the World Cup last summer that provided the final impetus.
  • Fuel cell system sets record
    April 16, 2012
    UTC Power, a United Technologies company, has announced that one of its latest generation PureMotion System Model 120 fuel cell powerplants for hybrid-electric transit buses has surpassed 10,000 operating hours in real-world service with its original cell stacks and no cell replacements. This powerplant is aboard an Alameda-Contra Costa Transit District (AC Transit) bus operating in the Greater Oakland, California area.