Skip to main content

Mitsubishi consortium receives letter of conditional acceptance for Doha Metro

A consortium of Mitsubishi Heavy Industries, Mitsubishi Corporation; Hitachi, The Kinki Sharyo and Thales has received a Letter of Conditional Acceptance from the Qatar Railways Company (Qatar Rail) for a systems package for the Doha Metro, the first metro system to be constructed in the State of Qatar. It is said to be one of the world’s largest projects for a single metro system. Construction is scheduled for completion by October 2019. Qatar Rail is the owner and manager of Qatar’s rail network and respo
February 23, 2015 Read time: 3 mins
RSSA consortium of 4962 Mitsubishi Heavy Industries, Mitsubishi Corporation; 2213 Hitachi, The Kinki Sharyo and 596 Thales has received a Letter of Conditional Acceptance from the Qatar Railways Company (Qatar Rail) for a systems package for the Doha Metro, the first metro system to be constructed in the State of Qatar. It is said to be one of the world’s largest projects for a single metro system. Construction is scheduled for completion by October 2019.

Qatar Rail is the owner and manager of Qatar’s rail network and responsible for the design, construction, commissioning, operation and maintenance of the entire rail network and systems. Phase 1 of the Doha Metro network will be launched in 2019; it will be implemented by multiple joint ventures involving renowned local and international contractors.

The new package calls for turnkey construction of a fully automated driverless metro system. Included are 75 sets of three-car trains, platform screen doors, tracks, a railway yard and systems for signalling, power distribution, telecommunications and tunnel ventilation. The package is also expected to include maximum 20-year maintenance services for the metro system after its completion.

Mitsubishi Heavy Industries, the leader of the consortium, will supply the power distribution system, platform screen doors, tracks and tunnel ventilation work, and will also undertake
overall project management and system integration. Mitsubishi Corporation and Kinki Sharyo will jointly provide the railway cars. Thales will supply the advanced communications based train control (CBTC) signalling, telecommunications and security, integrated Operational Control Centre and automatic fare collection systems. Hitachi will perform some project management duties and also handle facilities maintenance, including the supply of special maintenance vehicles that comprehensively inspect the safety of infrastructure such as railway tracks and electric train lines.

The metro will run through the city of Doha and will consist of four lines in two phases, covering a total distance of 241 kilometres with 106 stations, of which 123 kilometres will be constructed underground. The new metro system will connect the main areas of Doha, including the Hamad International Airport which opened in April 2014, the Old City, and newly developing inner city areas such as West Bay and Lusail.

"The Doha Metro ongoing works are being done according to our timeline that we set at the beginning of the project,” Qatar Rail's CEO Saad Ahmed Al Muhannadi said. “In 2013 and 2014, we signed many agreements that reached a remarkable value promising to deliver the best standards of metro railway in the near future. Today, with the five-member Japan
Consortium led by Mitsubishi Heavy Industries, we look forward to add more value to our project knowing the international expertise of the Japanese fellows and provide Doha with a fully secure and automated driverless metro system.”

Related Content

  • November 8, 2017
    Thales delivers automated train control systems to Santiago de Chile
    Thales has supplied its driverless train control system: Seltrac CBTC solution for Santiago de Chile’s new metro lines 3 and 6. The technology aims to ensure safety and efficiency across the entire route, with a 90 second interval between trains as well as lower long-term operating costs and savings in traction power. Launched on 2 November 2017, the new metro line 6 aims to carry over 20,000 passengers per hour in each direction. Together, both lines will have a combined length of 37km, with 28 station
  • September 29, 2020
    SkyTrain signals more work for Thales
    Contract win extends manufacturer's SelTrac CBTC footprint in Vancouver’s mass transit system
  • November 25, 2014
    Siemens, Thales land Spanish train deal
    Spanish administrator of railway infrastructures, Adif, has awarded the Thales/Siemens joint venture a contract for the installation of traffic control, automatic train protection, telecommunications and safety technologies on the Olmedo-Ourense high-speed line section, together with maintenance over a 20-year period. The amount of the contract is US$637 million. Thales is to install the European Railway Traffic Management System (ERTMS) Level 2 automatic train protection system, wayside LED light signal
  • January 7, 2015
    Thales to supply signalling for Guangzhou metro
    Thales, through its local joint venture Thales Saic Transportation, has been awarded the signalling contract for phase 1 of Guangzhou metro lines 14 and 21. Spanning around 138 kilometres in total, both lines will be equipped with Thales’ SelTrac CBTC rail signalling system. The two lines are designed to run with a combination of express and normal routes, which will significantly reduce journey times. Lines 14 and 21 are expected to be operational by the end of 2017. Based on a 100 per cent transfer