Skip to main content

Milestone for ChargePoint America

Coulomb Technologies has celebrated a significant milestone for the ChargePoint America programme. At a ceremony in Exposition Park hosted by the Honorable Antonio Villaraigosa, Mayor of Los Angeles. US Energy Secretary Steven Chu and Coulomb Technologies founder and CTO Richard Lowenthal unveiled the 500th ChargePoint America station available now on the ChargePoint Network. Others attending the ceremony included ChargePoint America programme vehicle partners Chevrolet, Ford and smart USA as well as electr
May 16, 2012 Read time: 2 mins
4824 Coulomb Technologies has celebrated a significant milestone for the 4825 ChargePoint America programme. At a ceremony in Exposition Park hosted by the Honorable Antonio Villaraigosa, Mayor of Los Angeles. US Energy Secretary Steven Chu and Coulomb Technologies founder and CTO Richard Lowenthal unveiled the 500th ChargePoint America station available now on the ChargePoint Network. Others attending the ceremony included ChargePoint America programme vehicle partners 1960 Chevrolet, 278 Ford and 4826 Smart USA as well as electric vehicles from 838 Nissan, 597 Tesla Motors, Coda and Smith.

The US$37 million ChargePoint America programme is made possible by a $15 million grant funded by the American Recovery and Reinvestment Act through the Transportation Electrification Initiative administered by the Department of Energy, combined with $22 million from other public agencies including the 4259 California Energy Commission and private industry. Adding to the existing ChargePoint Network, which is claimed to be the world’s largest charging network containing the largest number of EV drivers, the ChargePoint America programme will provide 4,600 public and home ChargePoint Networked Charging Stations this year.

Since Coulomb’s ChargePoint America programme announcement on 1 June, 2010, free programme charging stations have been awarded and installed in all of the original nine programme regions: Detroit, New York, Orlando, Fla., Washington DC, Sacramento, Calif., the San Jose/San Francisco Bay Area, Bellevue/Redmond, Wash, Los Angeles and Austin, TX. Recently, the programme announced expansion into six new cities including Baltimore, MD, Central Florida (Tampa), Boston, Santa Barbara, CA, Ventura, CA and Santa Cruz, CA. The ChargePoint stations at Exposition Park are free and open to the public and were installed by the Los Angeles Department of Water and Power (DWP) and made part of the ChargePoint America programme.

For more information on companies in this article

Related Content

  • Columbus wins US Smart City Challenge
    June 24, 2016
    Columbus, Ohio has been selected as the winner of the US Department of Transportation's (US DOT) Smart City Challenge. As winner of the Challenge, Columbus will receive up to US$40 million from US DOT and up to US$10 million from Vulcan to supplement the US$90 million that the city has already raised from other private partners to carry out its plan. The Smart City Challenge generated a significant amount of excitement and interest amongst cities. US DOT received seventy-eight applications in total – on
  • California's high-speed-rail project goes ahead
    October 20, 2014
    The California Supreme Court decided last week not to consider an appeal of a case brought by opponents of the state’s $68 billion bullet train project, paving the way for the project to go ahead. Opponents had questioned whether the California High-Speed Rail Authority was complying with the terms of the ballot measure that funded the project. The appellate court agreed there are legitimate legal concerns about whether the “high-speed rail project the California High-Speed Rail Authority seeks to bui
  • California aims to generate electric power from traffic congestion
    April 20, 2017
    California is planning a US$2.3 million initiative that will generate electrical power from traffic, according to the San Francisco Chronicle. The California Energy Commission recently voted to fund two piezoelectricity projects, which convert pressure into power. One pilot will test a 200-foot-long piece of asphalt on UC-Merced’s campus, which is designing a 200-foot stretch of asphalt that will be sowed with inch-wide piezoelectric generators, which will be stacked within arrays below the road where it is
  • Uber expands EV and hybrid offering
    January 20, 2021
    Ride-hailing giant also brings journey planning to cities in Mexico, India and Australia