Skip to main content

Michael Baker to provide construction services for Pennsylvania road upgrade project

In cooperation with the Pennsylvania Department of Transportation (PennDOT), Michael Baker International is to provide construction services for the improvement of Freedom Road, a major roadway that connects the northern suburbs of Pittsburgh, Interstate 79 and the Pennsylvania Turnpike to State Route 65 (SR 65). PennDOT recently awarded the company a US$4.9 million contract to provide construction management and inspection services for phases one and two of the multi-year project. As part of the c
December 21, 2016 Read time: 1 min
In cooperation with the 6111 Pennsylvania Department of Transportation (PennDOT), Michael Baker International is to provide construction services for the improvement of Freedom Road, a major roadway that connects the northern suburbs of Pittsburgh, Interstate 79 and the Pennsylvania Turnpike to State Route 65 (SR 65).

PennDOT recently awarded the company a US$4.9 million contract to provide construction management and inspection services for phases one and two of the multi-year project. 
 
As part of the contract, Michael Baker’s experts in construction management and inspection will ensure timely, efficient and safe delivery for the realignment and full reconstruction for portions of a three-mile stretch of Freedom Road, travelled by 4,567 commuters a day.  The improvements will include structure replacement, significant stream relocation, drainage upgrades, guide rail installations, signage and pavement markings, traffic signal upgrades and the addition of a turning lane at SR 65. 

For more information on companies in this article

Related Content

  • Consortium named for Pennsylvania PPP bridge project
    January 27, 2015
    A consortium comprising HDR, Plenary Group, Walsh Group and Granite Construction Company has been awarded the contract to replace 558 bridges as part of the Pennsylvania Rapid Bridge Replacement Project in the US. As lead design engineer for the construction joint venture, HDR will be responsible for bridge and roadway design services, environmental permits, right-of-way plan development and construction phase services. The team will begin construction in summer 2015 and complete all bridge replaceme
  • Dubai metro - the world's longest automated rail system
    July 31, 2012
    David Crawford reviews the recent opening of Dubai's Red Line. The US$7.6bn Dubai Metro, the Phase I Red Line of which started partial operation in September 2009, will be the world's longest driverless rail system on its planned completion in 2011. With a total length of some 75km, it will then overtake the 68.7km Vancouver SkyTrain and be able to carry over 1.2 million passengers on a typical day.
  • Imtech receives significant traffic technology orders
    January 15, 2013
    European technical services provider Royal Imtech (Imtech) has been awarded a series of contracts worth US$57.5 million to upgrade the current traffic infrastructure in Stockholm, Moscow, Dublin and Copenhagen, as well as providing the technical infrastructure in a double-deck tunnel in Maastricht, Holland. The company will implement a Motorway Traffic Management (MTM) system on the E18 motorway in Sweden, an important road link in the northern part of Stockholm, featuring two tunnels and used by 50,000 veh
  • ITS asset management matters
    April 26, 2013
    Maintenance of on-road ITS kit needs to become more sophisticated; while new technologies can deliver better road maintenance. David Crawford investigates both sides of the issue "Good information is key to effective ITS asset maintenance,” says Ian Routledge of the Ian Routledge Consultancy (IRC), whose Imtrac (Information Management for TRAffic Control) system is poised for European expansion. Developed as an ‘intelligent filing cabinet’ for storing information about on-road equipment, the online database