Skip to main content

Michael Baker to provide construction services for Pennsylvania road upgrade project

In cooperation with the Pennsylvania Department of Transportation (PennDOT), Michael Baker International is to provide construction services for the improvement of Freedom Road, a major roadway that connects the northern suburbs of Pittsburgh, Interstate 79 and the Pennsylvania Turnpike to State Route 65 (SR 65). PennDOT recently awarded the company a US$4.9 million contract to provide construction management and inspection services for phases one and two of the multi-year project. As part of the c
December 21, 2016 Read time: 1 min
In cooperation with the 6111 Pennsylvania Department of Transportation (PennDOT), Michael Baker International is to provide construction services for the improvement of Freedom Road, a major roadway that connects the northern suburbs of Pittsburgh, Interstate 79 and the Pennsylvania Turnpike to State Route 65 (SR 65).

PennDOT recently awarded the company a US$4.9 million contract to provide construction management and inspection services for phases one and two of the multi-year project. 
 
As part of the contract, Michael Baker’s experts in construction management and inspection will ensure timely, efficient and safe delivery for the realignment and full reconstruction for portions of a three-mile stretch of Freedom Road, travelled by 4,567 commuters a day.  The improvements will include structure replacement, significant stream relocation, drainage upgrades, guide rail installations, signage and pavement markings, traffic signal upgrades and the addition of a turning lane at SR 65. 

Related Content

  • February 2, 2012
    Active traffic management increases safety and capacity
    WSDOT is deploying Active Traffic Management in order to increase safety and capacity on its strategic roads. WSDOT's Patricia Michaud elaborates
  • January 27, 2012
    Improving urban traffic control in Atlanta
    Hugh Colton, Georgia DOT details move to improve urban traffic control in the Atlanta area. With a significant proportion of traffic using freeways and toll-ways, along with a significant investment in roadway infrastructure, urban arterials are often the poor relation when it comes to ITS investment. Hitherto the primary means of Urban Traffic Control (UTC) has been the ubiquitous traffic signal. Many traffic signals still operate in a standalone mode and traffic detection is often broken, leaving the sign
  • September 19, 2017
    Michigan fosters real-world testing of workzone ITS
    Turning a ‘problem’ into ‘an opportunity’ is the mantra of just about every business book and Michigan Department of Transportation (MDoT) looks set to achieve that aim in Oakland County, where 29km (18 miles) of the I-75 needs to be reconstructed. Running north-northwest from Detroit, the I-75 carries around 170,000 vehicles per day but, being built in the 1970s, it now requires an additional lane in each direction and upgrading to the latest design and safety standards. Upgrading will be carried out in
  • July 17, 2013
    PennDOT honoured for modernised data collection
    PennDOT's modernised field data collection process recently received an international achievement award for its innovative use of geographic information system technology. The Special Achievement in GIS (SAG) Award recognises vision, leadership, hard work and innovative use of technology and was presented at the Esri International User Conference in San Diego. PennDOT received the award for its use of technology to collect information on local roads and bridges such as location, condition and structure type