Skip to main content

Michael Baker International to aid SEPTA’s ‘Rebuilding the System’ program

As part of its Rebuilding the System Program, the South Eastern Pennsylvania Transportation Authority (SEPTA) in the US has awarded Michael Baker International a three-year, US$8-million contract to provide general engineering, construction management and inspection services to a range of SEPTA projects throughout south-eastern Pennsylvania. As part of the contract, the Michael Baker team will support SEPTA in their management of complex construction projects with the goal of ensuring quality, enhanci
August 17, 2016 Read time: 2 mins
As part of its Rebuilding the System Program, the South Eastern Pennsylvania Transportation Authority (SEPTA) in the US has awarded Michael Baker International a three-year, US$8-million contract to provide general engineering, construction management and inspection services to a range of SEPTA projects throughout south-eastern Pennsylvania.  
 
As part of the contract, the Michael Baker team will support SEPTA in their management of complex construction projects with the goal of ensuring quality, enhancing customer service and avoiding delays, changes and claims.

In addition, the company will supplement the in-house SEPTA project management staff, respond to emerging conditions and partner with SEPTA for cost-effective, safe and timely solutions in project delivery.
 
Combining a mixed transit system of legacy and modern stations, vehicles and infrastructure, SEPTA has spent more than 50 years shaping a network to meet the travel needs of south-eastern Pennsylvania.  Since the Pennsylvania Act 89 was passed in 2013, which created a long-term capital funding solution for critical highway and transit infrastructure needs across the US, SEPTA has taken an aggressive business approach to managing its asset portfolio, by rehabilitating or replacing bridges, replacing critical power systems, and designing and procuring new vehicles.

Related Content

  • March 26, 2012
    $129.5 million Philadelphia fare system contract awarded to ACS
    The Southeastern Pennsylvania Transportation Authority (SEPTA) board has voted to award a contract of up to US$129.5 million to ACS Transport Solutions Group for equipment and services for the installation of a modernised fare system under its new payment technologies (NPT) programme.
  • August 6, 2013
    Tolling agencies build resilience into highway operations
    IBTTA executive director and CEO Patrick D. Jones looks at tolling’s resilience in an increasingly unpredictable and cash-strapped world. Turbulent times call for transportation agencies to move smarter. That’s why resilience and preparedness have become watchwords in every aspect of tollway operations. From having the financial resources to invest in construction, maintenance and roadway operations, to having up-to-date emergency plans and social media strategies to cope with severe weather, tolling agenci
  • April 5, 2018
    Michael Baker International to implement US smart mobility corridor
    Michael Baker International will provide technical management for the implementation of connected vehicle technologies along a 35-mile stretch of the US Route 33 near Columbus, Ohio. The project aims to make roads safer, less congested and equipped for real-life testing of connected and autonomous vehicles and is scheduled for completion in January 2020. NW 33 Innovation Corridor Council of Governments (NW33) chose the provider of engineering solutions in a $1m (£710,200) contract that runs between the
  • September 10, 2014
    FDOT to rebuild major segment of I-4
    US transportation secretary Anthony Foxx has announced a Transportation Infrastructure Finance and Innovation Act (TIFIA) loan of US$950 million to help pay for the reconstruction and widening of 21 miles of Interstate 4 in metropolitan Orlando, Florida. This is the largest loan the Department has awarded to a public-private partnership (P3). When completed, the project will relieve congestion in one of the country's most heavily-travelled areas. Known as the I-4 Ultimate, the project is part of the 54-y