Skip to main content

Michael Baker International to aid SEPTA’s ‘Rebuilding the System’ program

As part of its Rebuilding the System Program, the South Eastern Pennsylvania Transportation Authority (SEPTA) in the US has awarded Michael Baker International a three-year, US$8-million contract to provide general engineering, construction management and inspection services to a range of SEPTA projects throughout south-eastern Pennsylvania. As part of the contract, the Michael Baker team will support SEPTA in their management of complex construction projects with the goal of ensuring quality, enhanci
August 17, 2016 Read time: 2 mins
As part of its Rebuilding the System Program, the South Eastern Pennsylvania Transportation Authority (SEPTA) in the US has awarded Michael Baker International a three-year, US$8-million contract to provide general engineering, construction management and inspection services to a range of SEPTA projects throughout south-eastern Pennsylvania.  
 
As part of the contract, the Michael Baker team will support SEPTA in their management of complex construction projects with the goal of ensuring quality, enhancing customer service and avoiding delays, changes and claims.

In addition, the company will supplement the in-house SEPTA project management staff, respond to emerging conditions and partner with SEPTA for cost-effective, safe and timely solutions in project delivery.
 
Combining a mixed transit system of legacy and modern stations, vehicles and infrastructure, SEPTA has spent more than 50 years shaping a network to meet the travel needs of south-eastern Pennsylvania.  Since the Pennsylvania Act 89 was passed in 2013, which created a long-term capital funding solution for critical highway and transit infrastructure needs across the US, SEPTA has taken an aggressive business approach to managing its asset portfolio, by rehabilitating or replacing bridges, replacing critical power systems, and designing and procuring new vehicles.

Related Content

  • June 6, 2014
    App informs drivers of delays during Long Beach bridge replacement
    David Crawford previews a work zone travel breakthrough. In February 2014, the Port of Long Beach in California launched what it claims is a groundbreaking construction zone navigation aid - LB Bridge mobile app. The app is designed to help drivers during the Gerald Desmond Bridge replacement programme by keeping them up to date on activity and the ensuing traffic diversions when construction starts in summer 2014. The unusually content-rich app is designed to convey current project news (enlivened by phot
  • August 5, 2013
    Travel times halve for tolling converts
    The Port Mann Bridge in Vancouver is a prime example of how the latest ITS systems enable new infrastructures to be built and paid for while still providing additional user benefits. Vancouver has 2.2 million inhabitants and, like so many major cities, is divided into two by a river, the Frazer river. This combination makes Vancouver the second most congested city in North America and the most congested in Canada. Through the middle of the city runs the Trans-Canadian Highway 1 which crosses the Frazer Riv
  • September 7, 2021
    How ITS weathers the storm on I-80
    Weather-related closures on Wyoming’s I-80 can cost as much as $11.7m each. But a new initiative is harnessing V2X technology to prevent snow shutting things down
  • February 3, 2012
    Safe-driver training reduces costs, increases safety
    Hermes, one of Europe's leading home delivery specialists, and part of the Otto group's European logistics division, estimates that introducing a range of safe-driving measures in its UK operations have contributed to a US$1.5 million cost saving to the business in the 12 months to April 2010.