Skip to main content

Mexico City airport to cost US$1 billion

Construction of a new airport on land adjacent to the Mexico City international airport, AICM, is expected to cost US$1.12billio, said transport and communications (SCT) minister Gerardo Ruiz during a presentation of the country's national infrastructure plan 2014-18.
May 1, 2014 Read time: 2 mins
Construction of a new airport on land adjacent to the Mexico City international airport, AICM, is expected to cost US$1.12billion, said transport and communications (SCT) minister Gerardo Ruiz during a presentation of the country's national infrastructure plan 2014-18.

The national infrastructure plan unveiled by the government "does not include (the cost) of new airport installations that are currently being evaluated," said Ruiz.

Mexico's civil aviation authority, DGAC, declared the airport officially saturated in April last year and no additional routes can be opened despite growing passenger demand.

The SCT announced planned in December last year to build a new airport on federal land adjacent to AICM, and has since invited a series of international architecture firms, in partnership with local firms, to design the new airport.

Seven firms, including British architects Zaha Hadid, Norman Foster, Richard Rogers and local architect Teodoro González de León have submitted designs for the project, reported architecture magazine Arch Daily.

In a sign that a new airport might be operated as a concession rather than owned and operated by state airport operator ASA, Ruiz confirmed that the investment would be drawn from public and private resources.

Ruiz also unveiled a series of new projects, including expansion of Lines 4 and 9 of the Mexico City metro systems, construction of mass transit systems for Merida and Torreón and the construction of 1,932 kilometres of new cargo rail lines. Existing rail concessionaires are also expected to build a further 1,560 kilometres of rail lines with their own resources. The SCT also plans to carry out the modernisation of 20 airports across the country, including Cancún, Chetumal, Jalapa, Toluca and Tlaxcala.

Related Content

  • Mexico’s Durango-Mazatlan highway sets tunnel safety standard
    September 14, 2016
    Mauro Nogarin looks at the management of the longer tunnels on Mexico’s Durango-Mazatlan highway. In recent years the National Infrastructure Fund of Mexico has increased investment in the installation of ITS systems on selected highways to increase road safety. One such major investment is the 230km long Durango-Mazatlan highway which is 12m in width and has an average speed of 110km/h.
  • Syracuse models post-industrial revival for US cities
    August 13, 2015
    A connective corridor in Syracuse, New York State, could be a model for other post-industrial cities, as David Crawford discovers. The aim of the city of Syracuse’ 5.6km-long Connective Corridor in Onandaga County in upstate New York is to create a model ‘complete street’ for use in wider regeneration schemes. Key transport-sector components are traffic calming, high-quality transit with accessible passenger information, plus walkability and bike-friendliness.
  • Key airport link open in US
    May 17, 2012
    The new Richmond Airport connector link road is now open to traffic. The link provides a direct connection from the Pocahontas 895 highway to Richmond International Airport and cuts journey time on this route. This 2.5km road is an extension of the Pocahontas 895 highway and links directly to Airport Drive at Charles City Road. The new road can save drivers around 10 minutes or more on a trip to the airport, especially those coming from Chesterfield County and the Tri-Cities area. Customers using the Airpor
  • TransCore wins new Doha airport access control system
    November 19, 2012
    US-headquartered ITS specialist TransCore is to design, implement, and maintain a state-of-the-art, radio frequency identification (RFID)-based parking and car/bus terminal access control system for authorised staff personnel of the New Doha International Airport Authority. The company was selected by Amana-Walbridge Joint Venture to install the system that will be operational during the second quarter 2013.