Skip to main content

Mexico City airport to cost US$1 billion

Construction of a new airport on land adjacent to the Mexico City international airport, AICM, is expected to cost US$1.12billio, said transport and communications (SCT) minister Gerardo Ruiz during a presentation of the country's national infrastructure plan 2014-18.
May 1, 2014 Read time: 2 mins
Construction of a new airport on land adjacent to the Mexico City international airport, AICM, is expected to cost US$1.12billion, said transport and communications (SCT) minister Gerardo Ruiz during a presentation of the country's national infrastructure plan 2014-18.

The national infrastructure plan unveiled by the government "does not include (the cost) of new airport installations that are currently being evaluated," said Ruiz.

Mexico's civil aviation authority, DGAC, declared the airport officially saturated in April last year and no additional routes can be opened despite growing passenger demand.

The SCT announced planned in December last year to build a new airport on federal land adjacent to AICM, and has since invited a series of international architecture firms, in partnership with local firms, to design the new airport.

Seven firms, including British architects Zaha Hadid, Norman Foster, Richard Rogers and local architect Teodoro González de León have submitted designs for the project, reported architecture magazine Arch Daily.

In a sign that a new airport might be operated as a concession rather than owned and operated by state airport operator ASA, Ruiz confirmed that the investment would be drawn from public and private resources.

Ruiz also unveiled a series of new projects, including expansion of Lines 4 and 9 of the Mexico City metro systems, construction of mass transit systems for Merida and Torreón and the construction of 1,932 kilometres of new cargo rail lines. Existing rail concessionaires are also expected to build a further 1,560 kilometres of rail lines with their own resources. The SCT also plans to carry out the modernisation of 20 airports across the country, including Cancún, Chetumal, Jalapa, Toluca and Tlaxcala.

Related Content

  • Asecap debates the future of tolling
    August 23, 2016
    Colin Sowman reports form Asecap’s Study & Information Days event in Madrid. At Asecap’s (the Association of European Toll Road Operators) recent Study and Information Days event there was no doubt about the subject at the top of the agenda: the European Union Directive 23/2014/EU. This will introduce fundamental changes to the concession model under which Asecap members operate more than 50,000km of tolled highways and, in response, it has compiled a report entitled Proposal for a Sustainable Concession Mo
  • Consortium awarded LRT project in Canada
    February 12, 2016
    TransEd Partners, a consortium including global engineering and construction company Bechtel, has been selected by the City of Edmonton to finance, design, supply vehicles, build, operate, and maintain the first phase of the Edmonton Valley Line Light Rail Transit project. The Valley Line is central to the City of Edmonton's transportation plan, designed to meet the demands of Canada's second fastest-growing city that is expected to increase in size by 50 per cent by 2040.
  • EU proposes to spend €2.7 billion for 152 transport projects
    June 29, 2017
    The European Commission is proposing to invest US$3 billion (€2.7 billion) in 152 key transport projects that support competitive, clean and connected mobility in Europe.
  • Colombia kicks off second wave of 4G highway plan
    December 16, 2014
    Colombia has published the pre-bid documents for the first concession under the second wave of the country's US$25 billion 4G highway plan, the 202 kilometre Puerta de Hierro-Palmar de Varela highway. Located in northern Colombia, the highway runs through the departments of Sucre, Atlántico and Bolívar. The project entails US$187 million improvement works on 175 kilometres, with construction estimated to take three years, said vice president Germán Vargas Lleras. The works are to be followed by a main