Skip to main content

Metrorex plans new Bucharest underground link

Bucharest underground operator Metrorex has nearly finished plans to develop its new US$1.35billion M6 underground mainline to link the city centre with Henri Coanda International Airport. The new M6 in the Romanian capital will have a length of 14km and take in 12 stations. Metrorex has changed the initial project plans by adding two new stations to cover the residential area and Baneasa Commercial Park.
May 17, 2012 Read time: 1 min
Bucharest underground operator 5599 Metrorex has nearly finished plans to develop its new US$1.35billion M6 underground mainline to link the city centre with Henri Coanda International Airport.

The new M6 in the Romanian capital will have a length of 14km and take in 12 stations. Metrorex has changed the initial project plans by adding two new stations to cover the residential area and Baneasa Commercial Park.

According to local authorities, the new trains on the M6 line will be fitted with passenger information display systems that will provide information in Romanian and a number of other languages about the schedule of airlines and the city of Bucharest.

The new line M6 will become operational in 2017-2018. The tender procedures will be launched on 3 September 2012. Consultants for the project are: 5600 Padeco and 5601 Oriental Consultants of Japan; Metrou Romania; 5603 Seneca Group International; and 5602 Systra of France.

Related Content

  • Mexico’s Durango-Mazatlan highway sets tunnel safety standard
    September 14, 2016
    Mauro Nogarin looks at the management of the longer tunnels on Mexico’s Durango-Mazatlan highway. In recent years the National Infrastructure Fund of Mexico has increased investment in the installation of ITS systems on selected highways to increase road safety. One such major investment is the 230km long Durango-Mazatlan highway which is 12m in width and has an average speed of 110km/h.
  • USDoT pilots show win-win potential for connected vehicles
    December 19, 2017
    Pete Goldin discovers the state of play with connected vehicles trials in the US and the impact of Hurricane Irma on Tampa’s pilot. The US Department of Transportation’s (USDoT’s) connected vehicle (CV) pilot sites have moved into phase 2 of the deployment programme– design, build, test and, maybe most importantly, collaborate.
  • Nairobi looks to ITS to ease travel problems
    December 21, 2017
    Shem Oirere looks at plans to tackle chronic congestion in the Kenyan capital. Traffic jams in the Kenyan capital, Nairobi, are estimated to cost the country $360 million a year in terms of lost man-hours, fuel and pollution. According to Wilfred Oginga, an engineer with the Kenya Urban Roads Authority (KURA), the congestion has been exacerbated by poor regulation and enforcement of traffic rules, absence of adequate traffic management systems and poor utilisation of existing road facilities.
  • Prospects for intercity transport technology
    February 1, 2012
    Magnetic levitation has been dismissed as unproven, too costly, or pie in the sky. It's time to reappraise it. With the unveiling by China (see News section, page 10) of its own, home-grown magnetic levitation train, it would be odd if politicians, policy-makers and the ITS industry did not want to take a closer look at the 'unproven' technology that is magnetic levitation. Fortunately, doing so is easy. The non-profit International Society for Maglev Transportation (The International Maglev Board) has an e