Skip to main content

Meridiam consortium named preferred proposer for Virginia's transform 66 project

A consortium of Meridiam, Cintra, Ferrovial Agroman US, Allan Myers VA, Janssen & Spaans Engineering, the Louis Berger Group and American Structurepoint has been named Preferred Proposer by the Commonwealth of Virginia for the State’s Transform 66 Project. I-66 Express Mobility Partners will design, build, finance, maintain and operate the I-66 Outside the Beltway project under the Public Private Partnership (P3) Transportation Act. The project is designed to relieve congestion, improve safety and provi
December 12, 2016 Read time: 2 mins
A consortium of 7905 Meridiam, 5428 Cintra,  4419 Ferrovial Agroman US, Allan Myers VA, Janssen & Spaans Engineering, the 4736 Louis Berger Group and American Structurepoint has been named Preferred Proposer by the Commonwealth of Virginia for the State’s Transform 66 Project.

I-66 Express Mobility Partners will design, build, finance, maintain and operate the I-66 Outside the Beltway project under the Public Private Partnership (P3) Transportation Act. The project is designed to relieve congestion, improve safety and provide more predictable travel times for Northern Virginia and Washington, DC metro region.

The I-66 Outside the Beltway Project extends 22 miles along the Interstate 66 corridor outside of the Beltway, Once completed, it will provide significant upgrades to one of the East Coast’s most highly congested corridors, including three regular lanes in each direction and two express lanes in each direction with a state-of-the-art open-road electronic toll collection system.

It will also provide direct access between the express lanes and new or expanded commuter lots, mew and expanded transit service and park-and-ride lots; and interchange improvements to enhance safety and reduce congestion.

Related Content

  • January 18, 2013
    Transit hub promised in San Diego area
    San Diego North County’s Interstate 15 corridor is best known for its flood of freeway traffic, not its mass transit stations. This is due to change next year, when the Sabre Springs/Penasquitos transit station, just east of I-15 on Sabre Springs Parkway, is set to undergo a US$12.2 million face-lift that will include a four-storey parking garage, electric vehicle charging stations, electronic next bus signs and even some smart parking spaces. “This will be our flagship station,” said Frank Owsiany, who ov
  • September 21, 2015
    Go-ahead for Richmond-to-Raleigh high-speed rail proposal
    The US Department of Transportation (DOT)’s Federal Railroad Administration (FRA), the State of North Carolina and the Commonwealth of Virginia have signed off on the Final Environmental Impact Statement (FEIS) for the proposed Richmond to Raleigh (R2R) passenger rail line along the Southeast Corridor. The completion of the FEIS is one of the final steps necessary before construction of the project can move forward once funding is secured. The 162-mile route between the two cities would utilise existing
  • April 2, 2014
    The great pay divide
    Public acceptance is crucial for the acceptance of managed and express lanes as Jon Masters discovers. Lists of proposed highway expansion projects introducing variably priced toll lanes continue to lengthen. Managed lanes, or express lanes to some, are gaining support as a politically favourable way of adding capacity and reducing acute congestion on principal highways. In Florida, for example, the managed lanes on the 95 Express are claimed to have significantly increased average peak-time speeds on tolle
  • March 4, 2015
    Consortium to build Finnish motorway
    The Finnish Transport Agency has appointed a consortium of Meridiam Infrastructure and YIT Rakennus as the service provider which will build the E18 Hamina–Vaalimaa motorway in Finland on a public-private partnership (PPP) basis. Construction will commence in autumn 2015 and the entire motorway is estimated to be completed in 2018. The consortium will be responsible for financing of the project, as well as planning, construction and maintenance for a period of 20 years. The E18 Hamina–Vaalimaa project compr