Skip to main content

Mazda first of its kind regenerative braking system developed

Mazda Motor Corporation has developed a regenerative braking system for passenger cars capable of improving fuel economy by approximately 10 per cent. The new i-ELoop (intelligent energy loop) system, claimed to be the first of its kind in the world to use a capacitor, will begin to appear in Mazda vehicles from 2012.
March 26, 2012 Read time: 2 mins
RSS1844 Mazda Motor Corporation has developed a regenerative braking system for passenger cars capable of improving fuel economy by approximately 10 per cent. The new i-ELoop (intelligent energy loop) system, claimed to be the first of its kind in the world to use a capacitor, will begin to appear in Mazda vehicles from 2012.

i-ELoop efficiently converts the vehicle’s kinetic energy into electricity as it decelerates, using the electricity to power the climate control, audio system and numerous other electrical components. The innovative capacitor technology can store large volumes of electricity and, unlike batteries, can be charged and discharged rapidly and is resistant to deterioration through prolonged use.

Mazda claims that, unlike the regenerative braking systems found in hybrid vehicles, its highly efficient solution avoids the need for a dedicated electric motor and battery. i-ELoop features a new variable voltage(12-25V) alternator, a low-resistance electric double layer capacitor (EDLC) and a DC/DC converter. The system starts to recover kinetic energy the moment the driver lifts off the accelerator pedal and the vehicle begins to decelerate. The variable voltage alternator generates electricity at up to 25V for maximum efficiency before sending it to the EDLC for storage. The capacitor, which has been specially developed for use in a vehicle, can be fully charged in seconds. The DC/DC converter steps down the electricity from 25V to 12V before it is distributed directly to the vehicle’s electrical components.

For more information on companies in this article

Related Content

  • Big data and open governments ‘will spur developments in smart cities’
    March 23, 2015
    Smart cities are going to be amazing community hubs that will be more sustainable, efficient and supportive of citizens, according to a new report, Australia - Smart Cities - People, Transport, Cars, Buildings from reportbuyer.com. The concept of smart communities is based on intelligent infrastructure such as broadband (FttP) and smart grids, so that connected and sustainable communities can be developed. However, they cannot be built within the silo structure that currently dominates our thinking; a holis
  • Winners in electric vehicle batteries
    July 13, 2015
    According to market analyst IDTechEx, which tracks the development of 45 electric vehicle categories and not just electric cars, there are now lithium-ion battery options for everything from forklifts and mobility vehicles for the disabled to e-bikes. Indeed, almost all the e-bikes in the West and Japan use them. 8000 forklifts in the USA have fuel cells with lithium-ion batteries though the Toyota Mirai fuel cell car and the Prius hybrid car still use NiMH. Whilst capturing market in micro hybrid cars,
  • Big data and GPS combine to cut emergency response times
    April 2, 2014
    David Crawford looks at technologies for better emergency medical service delivery. Emergency medical services (EMS) play key roles in transporting, or bringing treatment to, patients who become ill through medical emergencies or are injured in road traffic accidents (RTAs). But awareness has been rising steadily, in the US and elsewhere, of the extent to which EMS can generate their own emergencies. The most common cause is vehicles causing or becoming involved in RTAs, as a result of driving fast under pr
  • Another section of West Coast Green Highway EV charging infrastructure announced
    April 19, 2012
    The Washington State Department of Transportation (WSDOT) has selected AeroVironment to manufacture, supply, install and operate a network of nine fast-charging stations for electric vehicles on Interstate 5 and US 2. Stations will be located every 40 to 60 miles along stretches of I-5 between the Canadian border and Everett and between Olympia and the Oregon border, as well as along US 2 between Everett and Leavenworth.